Julián
Alcalá González
Civil Engineer (Master’s degree level) · PhD in Construction Engineering
Teaching, research and knowledge transfer in construction engineering, structures, optimisation and infrastructure management.
Deputy Director for Extracurricular Activity
Academic and professional activity
Explore by area
Built engineering
Selected projects
A visual selection of projects from the professional track record.
Full curriculum vitae
Detailed track record
The following sections provide the complete academic and professional record. Subsections can be expanded and collapsed for easier browsing.
Academic background
Civil Engineer (Ingeniero de Caminos, Canales y Puertos)
Universitat Politècnica de ValènciaClass of 1992
Equivalent to a Master’s Degree in Civil Engineering
Specialization: Foundations and Structures
PhD in Construction Engineering
Doctoral thesis:
Economic heuristic optimisation of prestressed concrete slab bridge decks
Defended on 29 January 2010 at the Universitat Politècnica de València.
Supervisors: Fernando González Vidosa and Víctor Yepes Piqueras.
Highest distinction:
Sobresaliente cum laude
Thesis committee:
- Ángel Carlos Aparicio Bengoechea (Chair)
- José Luis Bonet Senach (Secretary)
- Santiago Hernández Ibáñez (Member)
- Fermín Luis Navarrina Martínez (Member)
- Josep Ferri Rabasa (Member)
Teaching
Academic positions
| ACADEMIC POSITION | START DATE | END DATE |
| ASSOCIATE PROFESSOR (Profesor Titular de Universidad) | 03/12/2021 | - - |
| CONTRACTED DOCTOR PROFESSOR (Profesor Contratado Doctor) | 10/10/2011 | 02/12/2021 |
| COLLABORATING PROFESSOR (Profesor Colaborador) | 05/06/2007 | 09/10/2011 |
| ASSISTANT PROFESSOR (Profesor Ayudante) | 08/02/2005 | 04/06/2007 |
| PART-TIME LECTURER (Profesor Asociado) | 01/10/2001 | 07/02/2005 |
| PART-TIME LECTURER (Profesor Asociado) | 09/03/2001 | 30/09/2001 |
Courses taught
| DEGREE PROGRAMME | COURSE | ACADEMIC YEAR |
|---|---|---|
| BACHELOR’S DEGREE IN CIVIL ENGINEERING | Construction Methods I (14841) |
|
| Construction Methods I (12815) |
|
|
| Construction Methods II (12816) |
2022/23 2021/22 2020/21 2019/20 2012/13 2011/12 |
|
| Infrastructure Maintenance Management (12869) |
2024/25 2023/24 2022/23 2021/22 2020/19 2019/20 2018/19 |
|
| BACHELOR’S DEGREE IN PUBLIC WORKS ENGINEERING | Construction Types and Methods I (12502) |
2011/12 |
| Construction Types and Methods II (12505) |
2012/13 2011/12 |
|
| Construction Site Setup, Organisation and Quality Assurance (12815) |
2023/24 2022/23 2021/22 2020/21 2018/19 2015/16 2013/14 |
|
| BACHELOR’S DEGREE IN TRANSPORT AND LOGISTICS MANAGEMENT | Sustainability, Quality and Safety (14726) |
|
| BACHELOR’S DEGREE IN AEROSPACE ENGINEERING | Airport Construction (7370) |
|
| MASTER’S DEGREE IN CIVIL ENGINEERING (INGENIERÍA DE CAMINOS, CANALES Y PUERTOS) | Business Management (33547) |
2022/23 |
| MASTER’S DEGREE IN PLANNING AND MANAGEMENT IN CIVIL ENGINEERING | Quality, Innovation and Sustainability in the Construction Sector (35994) |
|
| Quality, Innovation and Sustainability in the Construction Sector (35335) |
2023/24 2022/23 |
Strategic Management of Quality and Sustainability in Construction (31836) |
2020/21 2019/20 2018/19 2017/18 2016/17 2015/16 |
| Quality Management in Construction (31836) |
2013/14 2012/13 2011/12 2010/11 |
|
| Quality Assurance (31836) |
|
|
| Planning and Scheduling (35999) |
|
|
| Construction Planning and Management (35339) |
2023/24 2022/23 |
|
| Project Scheduling Techniques (32253) |
2020/21 2019/20 2018/19 2017/18 2016/17 2015/16 2014/15 2013/14 2012/13 2011/12 2010/11 |
|
| Project Management (31834) |
|
|
| MASTER’S DEGREE IN CONCRETE ENGINEERING | Predictive and Optimization Models for Concrete Structures (32755) |
2024/25 2023/24 2022/23 2021/22 2020/21 2019/20 2018/19 2017/18 2016/17 2015/16 2014/15 2013/14 2012/13 |
| Heuristic Optimization of Concrete Structures (31429) |
|
|
| Construction and Quality Control of Concrete Structures (32762) |
2016/17 2015/16 2014/15 2013/14 |
|
| Construction of Concrete Structures and Bridges (31422) |
2011/12 2010/11 2009/10 2008/09 |
|
| CIVIL ENGINEERING DEGREE (INGENIERÍA DE CAMINOS, CANALES Y PUERTOS, 1997 CURRICULUM) | Construction Methods (4729) |
2008/09 2007/08 2006/07 |
| Quality Assurance (5607) |
2009/10 |
|
| PUBLIC WORKS TECHNICAL ENGINEERING DEGREE (1997 CURRICULUM) | Construction Methods (3376) |
2009/10 2008/09 2007/08 2006/07 |
| Quality Assurance (3504) |
2009/10 |
|
| CIVIL ENGINEERING / PUBLIC WORKS TECHNICAL ENGINEERING (1997 CURRICULUM) | Descriptive and Metric Geometry (3353) |
2003/04 2002/03 2001/02 2000/01 |
| Technical Drawing (3346) |
2003/04 2002/03 2001/02 |
Teaching publications
- Técnicas de voladuras y excavación en túneles.
- Martí Albiñana, José Vicente; Yepes Piqueras, Víctor; González Vidosa, Fernando; Alcalá González, Julián; Escuela Técnica Superior de Ingenieros de caminos, Canales y Puertos | Valencia : Editorial UPV, D.L. 2012. Ref. 530, 165 pp.
- Técnicas de Planificación y Control de Obras.
- Yepes Piqueras, Víctor; Martí Albiñana, José Vicente; González Vidosa, Fernando; Alcalá González, Julián; Escuela Técnica Superior de Ingenieros de caminos, Canales y Puertos | Valencia : Editorial UPV, D.L. 2012, 2015. Ref. 189, 94 pp.
- Maquinaria Auxiliar y Equipos de Elevación.
- Yepes Piqueras, Víctor; Martí Albiñana, José Vicente; González Vidosa, Fernando; Alcalá González, Julián; Escuela Técnica Superior de Ingenieros de caminos, Canales y Puertos | Valencia: Editorial UPV, D.L. 2012. Ref. 814, 202 pp.
- Temas de Procedimientos de Construcción: Técnicas para la Mejora de Terrenos.
- González Vidosa, Fernando; Yepes Piqueras, Víctor; Martí Albiñana, José Vicente; Alcalá González, Julián; Universidad Politécnica de Valencia. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil | Valencia : Universidad Politécnica de Valencia, 2011. Ref. 753, 60 pp.
- Temas de Procedimientos de Construcción. Cables y Maquinaria de Elevación.
- González Vidosa, Fernando; Yepes Piqueras, Víctor; Martí Albiñana, José Vicente; Alcalá González, Julián; Universidad Politécnica de Valencia. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil | Valencia : Editorial UPV, 2004, 2007, 2010. Ref. 522, 61 pp.
- Procedimientos de Construcción. Fabricación, Transporte y Colocación de Hormigones.
- González Vidosa, Fernando; Yepes Piqueras, Víctor; Martí Albiñana, José Vicente; Alcalá González, Julián; Universidad Politécnica de Valencia. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil | Valencia : Editorial UPV, 2007. Ref. 613, 68 pp.
- Equipos de Dragado. Temas de Procedimientos de Construcción.
- González Vidosa, Fernando; Yepes Piqueras, Víctor; Martí Albiñana, José Vicente; Alcalá González, Julián; Clemente Tirado, Juan José; Universidad Politécnica de Valencia. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil | Valencia : Editorial UPV, 2006. Ref. 438, 74 pp.
- Temas de Procedimientos de Construcción. Equipos de Movimiento y Transporte de Tierras
- González Vidosa, Fernando; Yepes Piqueras, Víctor; Martí Albiñana, José Vicente; Alcalá González, Julián; Universidad Politécnica de Valencia. Departamento de Ingeniería de la Construcción y de Proyectos de Ingeniería Civil | Valencia : Universidad Politécnica de Valencia, 2008. Ref. 738, 119 pp.
Construction methods notes
Project scheduling notes
Participation in teaching and educational innovation conferences
-
GARRIDO DE LA TORRE, E.; PÉREZ ZURIAGA, A.M.; CAMACHO TORREGROSA, F.J.; ANDRÉS DOMENECH, I.; ROMERO GIL, I.; ALCALÁ GONZÁLEZ, J.; ALBENTOSA HERNÁNDEZ, E.; COLL, H. (2016). TFG multidisciplinar en el área de la Ingeniería Civil . Jornadas Red Estatal de Docencia Universitaria (RED-U), pp. 189–195. UNED, Madrid, 10–11 November.
-
CAMACHO TORREGROSA, F.J.; PÉREZ ZURIAGA, A.M.; COLL CARRILLO, H.; ALCALÁ GONZÁLEZ, J.; ROMERO GIL, I.; GARRIDO DE LA TORRE, E. (2015). Desarrollo de un Trabajo de Fin de Grado Multidisciplinar en Ingeniería Civil como preparación del alumno para la vida profesional. Congreso Nacional de Innovación Educativa y Docencia en Red (IN-RED), pp. 1249–1263. Valencia, 30 June–1 July.
-
GIMÉNEZ, E.; SANZ, A.; LOZANO, A.; MARTÍ-VARGAS, J.R.; ALCALÁ, J.; CATALÁ, J.; CORTÉS, R.; LOZANO, J.F. (2014). La introducción de la responsabilidad profesional en los estudios de Grado en Ingeniería en Obras Públicas. Jornadas de Innovación Educativa y Docencia en Red (IN-RED), pp. 1166–1175. Valencia, 15–16 July 2014.
-
YEPES PIQUERAS, V.; ALCALÁ GONZÁLEZ, J.; MARTÍ ALBIÑANA, J.V.; GONZÁLEZ VIDOSA, F. (2013). Cómo predimensionar muros óptimos sin calculadora usando la inteligencia artificial. 2º Congreso Nacional sobre la Enseñanza de las Matemáticas en Ingeniería de Edificación (EMIE), pp. 119–134. Valencia, 18–19 July 2013.
-
BARCENA SAIZ, A.; YEPES PIQUERAS, V.; ALCALÁ GONZÁLEZ, J.; MARTÍ ALBIÑANA, J.V. (2013). Diseño automático de forjados de chapa nervada optimizados con criterios de economía y sostenibilidad. 2º Congreso Nacional sobre la Enseñanza de las Matemáticas en Ingeniería de Edificación (EMIE), pp. 159–172. Valencia, 18–19 July 2013.
-
MARTÍ ALBIÑANA, J.V.; YEPES PIQUERAS, V.; ALCALÁ GONZÁLEZ, J.; GARCÍA SEGURA, T. (2013). Diseño de vigas en U de hormigón con fibras mediante la heurística SA con criterios económicos. 2º Congreso Nacional sobre la Enseñanza de las Matemáticas en Ingeniería de Edificación (EMIE), pp. 299–309. Valencia, 18–19 July.
-
YEPES PIQUERAS, V.; MARTÍ ALBIÑANA, J.V.; ALCALÁ GONZÁLEZ, J.; GARCÍA SEGURA, T. (2013). Métodos empleados en el Proyecto HORSOST sobre diseño sostenible con hormigón no convencional. 2º Congreso Nacional sobre la Enseñanza de las Matemáticas en Ingeniería de Edificación (EMIE), pp. 259–272. Valencia, 18–19 July.
-
RODRIGUEZ-CALDERITA FACUNDI, A.M.; ALCALÁ GONZÁLEZ, J.; YEPES PIQUERAS, V.; MARTÍ ALBIÑANA, J.V. (2013). Optimización heurística aplicada al diseño automático de forjados de losa postesa. 2º Congreso Nacional sobre la Enseñanza de las Matemáticas en Ingeniería de Edificación (EMIE), pp. 63–75. Valencia, 18–19 July.
-
MARTÍ ALBIÑANA, J.V.; YEPES PIQUERAS, V.; ALCALÁ GONZÁLEZ, J.; GARCÍA SEGURA, T. (2013). Optimización memética de vigas artesa prefabricadas con criterios sostenibles de hormigón con fibras. 2º Congreso Nacional sobre la Enseñanza de las Matemáticas en Ingeniería de Edificación (EMIE), pp. 91–104. Valencia, 18–19 July.
-
GARCÍA SEGURA, T.; YEPES PIQUERAS, V.; ALCALÁ GONZÁLEZ, J.; MARTÍ ALBIÑANA, J.V. (2013). Optimización multiobjetivo de viga en I de hormigón armado con criterios sostenibles. 2º Congreso Nacional sobre la Enseñanza de las Matemáticas en Ingeniería de Edificación (EMIE), pp. 135–148. Valencia, 18–19 July.
-
TORRES-MACHÍ, C.; YEPES, V.; ALCALÁ, J.; PELLICER, E. (2012). Optimización heurística de estructuras de hormigón armado de alta resistencia. III Jornadas de Modelización Matemática, 7–8 June, Gandía (Spain).
-
YEPES, V.; GONZÁLEZ-VIDOSA, F.; MARTÍ, J.V.; ALCALÁ, J. (2011). A short postgraduate course on heuristic design of prestressed concrete road bridge deks. 5th International Technology, Education and Development Conference. ISBN: 978-84-614-7423-3; ISSN: 2340-1079. pp. 5132–5141. Editor: IATED. 7–9 March, Valencia, Spain.
-
GONZÁLEZ-VIDOSA, F.; YEPES, V.; ALCALÁ, J.; PEREA, C.; MARTÍNEZ, F. (2007). A postgraduate course on heuristic design of reinforced concrete structures. International Technology, Education and Development Conference INTED 2007. Abstracts Book, p. 314. ISBN: 978-84-611-4516-4. Proceedings CD, 12 pp., ISBN: 978-84-611-4517-1. Editor: IATED. March, Valencia, Spain.
Supervised academic work
-
- Capilla Pradas, Miguel Ángel. Construction Project for a Stormwater Storage Tank in the Altabix–University District, Elche. 17/07/26
- Álvarez Atehortua, Valentina. Preliminary Design of the new accessible Metrovalencia station: València Sud (Valencia). 30/04/26
- Briones Pincay, Carlos Andrés. Economic planning and forecasting of results for the rehabilitation and pavement-strengthening works on the CV-685 (VV-1011) in Villalonga (Valencia), incorporating uncertainty. 31/03/26
- García Manchón, Arcadio. Structural design of a road bridge located at chainage 8+500 on the CV-60 near Bélgida (Valencia). 28/01/26
- Granados Chaparro, Javier Estiben. Comparative analysis for the efficient planning of urban railway works, applied to the construction units of the new railway access channel to the city of Valencia. 28/01/26
- Hañare Noriega, Daniela Milagros. Strategic planning for the marketing of prefabricated rural housing in Peru. 26/11/25
- García Ojeda, Carlos Fabrizzio. Business plan for the import and marketing of prefabricated school modules for emergency situations in the southern Andean highlands of Peru. 25/09/25
- Amaya Silva, Edison. Application of UHPFRC to thin-shell canopies for petrol stations: optimized structural and construction proposal compared with conventional steel solutions. 24/09/25
- Serrano Vargas, Harold Alberto. Development of a numerical model for the analysis and design of flexible reinforced-concrete earth-retaining structures. 23/09/25 (Academic supervisor: Alcalá González, Julián)
- Filimonov, Vasilii. Structural design of the railway bridge located at the access to the new intermodal station of the Sagunto Logistics Area (Valencia). 19/09/25
- Prats Latorre, Elisa. Construction Project for the Castellón de la Plana seafront promenade in the section between Camí la Plana and Camí la Ratlla (Castellón). 18/09/25
- Rodríguez Robayo, Nataly Johanna. Optimization of the construction planning of a residential building in Sagunto (Valencia) using line-of-balance scheduling. 30/06/25
- El Madani el Gomari, Jasser. Study of the construction procedure and quality plan for the Campus Mobilité ventilation and safety shaft on Paris Metro Line 18 (France). 28/11/24
- Oliver Ferrándiz, Sonia. Study of ground-improvement solutions for the underground pedestrian connection works between the FGV stations of Alacant and Xàtiva (Valencia). 30/09/24
- Draguicevic Vega, Felipe. Technical and economic scheduling of Stage 2 of the multipurpose quay works in Puerto Williams (Chile). 24/09/24
- Orozco Cremades, Blanca. Study for the improvement of the construction works of the interceptor sewer on Avenida Espioca in Silla (Valencia). 25/07/24
- Miñana Borja, Diego. Study for the improvement of road safety and the cycle-pedestrian route along the CV-567 between the municipalities of Cerdá and Xàtiva (Valencia). 09/07/24
- Pedreira Carro, Daniel. Study for the installation of an overhead crane and improvement of operations at the East Dock of the Port of Valencia. 09/07/24
- Barohu el Bakli, Ghizlan. Preliminary Design of a 400 kV transmission line between the Villamayor electrical substation and the Barbadillo traction substation, in the province of Salamanca. 29/02/24
- Bautista Moya, María del Carmen. Structural design of a footbridge as part of the expansion works at Hospital 12 de Octubre in Madrid. 28/09/23
- Chacón Moreno, Jesús Nicolás. Structural design of a footbridge over the AP-7 between the municipalities of Riba-Roja de Túria and Manises (Valencia). 27/09/23
- Yepes Bellver, Víctor José. Study for the location and structural design of a multi-storey park-and-ride facility in the Valencia metropolitan area. 27/09/23
- Laalam, Amina. Scheduling of the underground pedestrian connection works between the Alacant and Xàtiva metro stations in the city of Valencia. 19/09/23
- Muñoz López, Judit. Structural design of an observation tower in Cullera (Valencia). 19/09/23
- Pujante Saura, Edgar. Study for the replacement of an asbestos roof with rock-wool panels in preparation for the future installation of photovoltaic solar panels on an industrial building in Canet d’En Berenguer (Valencia). 27/07/23
- Pascual Vanaclocha, Emilio. Structural design of a cycle-pedestrian bridge over the Aiguaoliva ravine, between the municipalities of Benicarló and Vinaroz (Castellón). 27/09/22
- Ruiz Vélez, Andrés. Economic heuristic optimization of precast reinforced-concrete frames. 26/09/22
- Ferrero Montes, Alejandro. Structural design of a pergola-type overpass on the Madrid–Levante high-speed railway line, in the municipality of Parla (Madrid). 19/09/22
- Cózar Mañez, Andrés. Study for the upgrading and improvement of accessibility to Cala el Xarco, in Villajoyosa (Alicante). 28/07/22
- de Fuenmayor Ricardo, Miguel Arturo. Design of a cycle-pedestrian bridge over the Agres River, in the municipality of Muro de Alcoy (Alicante). Alternatives study. 28/07/22
- García Cárcel, Alberto. Design of a cycle-pedestrian bridge over the Agres River, in the municipality of Muro de Alcoy (Alicante). Structural design. 28/07/22
- Ruiz López, Francisco José. Analysis of the implementation of the Lean management model in construction and metalworking companies. 28/09/21
- Peris Fernández, Raúl. Structural design of a cycle-pedestrian bridge for the upgrading of the CV-35 urban crossing through Chelva (Valencia). 27/07/21
- Brun Izquierdo, Alejandro. Energy optimization of voided prestressed-concrete slab bridge decks using Kriging models. 10/12/20
- Yepes Bellver, Lorena. Optimal design of voided prestressed-concrete slab bridge decks with respect to CO 2 emissions using metamodels. 10/12/20
- Pérez Costero, Miguel. Structural design of the deck of overpass E-9 on the A-32 motorway, southern bypass of Albacete. 10/12/20
- Pérez-Almazán Piwowarsky, Cristian. Preliminary structural design of a new grandstand for the football pitch at the Villamarchante sports complex (Valencia). 04/12/20
- Emilio Pascual Vanaclocha. Comparative study of Quality Management in the automotive and construction sectors. 24/11/20
- Franco Segarra, Rogelio. Study of the construction process and proposal for improvements in caisson construction during the modernization works of the breakwaters at the North Port of Gdansk (Poland). 23/09/2020
- Sevilla Fernández, Marcos. Design and structural analysis of a pedestrian bridge over the Barranco de Teulada in Villamarchante (Valencia). 28/05/20
- Abalco Armas, Henry Roberto. Optimal design of a very-high-strength concrete truss for the roof of the Almussafes municipal swimming pool (Valencia). 16/07/19
- Payá Roselló, Jordi. Management Plan for the Industrial Infrastructure of the Lafarge-Holcim cement plant located in the Sepes Industrial Estate, Puerto de Sagunto (Valencia). 15/04/19
- Cases Villar, Javier. Development of a project close-out management tool. 28/09/18
- Hernández Palomares, Víctor. Preparation of a practical document for the development of motorway projects in Spain. 28/09/18
- Wu, Chengru. Quality Management in prefabricated building construction in China. 26/09/18
- Hernández Santos, Ausencio Alexander. Performance management plan for turnkey projects in the construction sector. 20/09/18
- Pardo Goicoechea, Enrique. Planning and management methodology for urban redevelopment works. Application to the redevelopment of Pare Barranco Street in the city of Valencia. 20/09/18
- Brun Izquierdo, Alejandro. Optimal design study for the deck of the viaduct located at km 441 of the A-7 in the municipality of Cocentaina (Alicante). Deck analysis. 18/09/18
- Yepes Bellver, Lorena. Optimal design study for the deck of the viaduct located at km 441 of the A-7 in the municipality of Cocentaina (Alicante). Optimization using Kriging models. 18/09/18
- Augustin, Madalina. Study of the construction scheduling of a car storage building in the Port of Valencia. 19/07/18
- Cabrero García, David. Structural design and analysis of an extradosed bridge over the Valdelinares River on the Madrid–Extremadura high-speed railway line. Municipality of Plasencia (Cáceres). Structural verification. 21/09/17
- Martín, Sara. Study of the piers of Viaduct 0.3B on the connection between Mascara and the East–West Motorway. Municipality of Mascara (Algeria). 27/07/17
- Ramón Sierra, Cristina. Disputes in construction projects. Methods for quantifying and assessing delays. 30/06/17
- Ottobrino Capdevila, Borja. Structural design and analysis of an extradosed bridge over the Valdelinares River on the Madrid–Extremadura high-speed railway line. Municipality of Plasencia (Cáceres). Structural analysis. 26/01/17
- Hour, Visoth. Analysis of the current situation of the construction sector in Cambodia. 20/09/16
- Cervera Vallbona, Ana. Structural analysis of a prestressed-girder bridge at chainage 18+198 of the Mascara Motorway over the Oued el Mouaissiya ravine (Algeria). Abutments. 15/09/16
- Esteve Vilar, Víctor. Structural analysis of a prestressed-girder bridge at chainage 18+198 of the Mascara Motorway over the Oued el Mouaissiya ravine (Algeria). Foundations. 15/09/16
- Jiménez Serrano de la Cruz, David. Structural analysis of a prestressed-girder bridge at chainage 18+198 of the Mascara Motorway over the Oued el Mouaissiya ravine (Algeria). Piers. 15/09/16
- Kubaychuk, Kostyantyn. Structural analysis of a prestressed-girder bridge at chainage 18+198 of the Mascara Motorway over the Oued el Mouaissiya ravine (Algeria). Deck. 15/09/16
- Molina Jotel, Víctor. Heuristic optimization of T-section pedestrian bridges under economic and sustainability criteria. 18/07/16
- San Millán Vallejo, Javier. Heuristic optimization of a rectangular pile cap supported by four cast-in-place piles. 29/09/15
- Cariñena Díaz, Jaime. In-situ cast architectural concrete surfaces. 18/07/14
- Ulpiano Cogollos, José Luis. Efficiency in business-management activities in organizations related to construction and civil engineering. 01/07/14
- García Segura, Tatiana. Metrics for the efficient design of structures using non-conventional concretes based on multi-objective sustainability criteria. 01/07/13
- Leiro Gómez, Daniel. Automated design and parametric study of buttressed earth-retaining walls. 08/02/13
- Manzanaro Marhuenda, Alicia. Impact of the management of activities in public-watercourse influence zones on flood-flow regimes. Case study of the Barranco de la Cala catchment in the municipality of Finestrat (Alicante). 27/09/12
- López Crispín, Julián. Efficient design of waffle slabs based on economic and environmental criteria. 26/09/12
- Martínez Arguisuelas, Alberto. Identification of the technical and economic criteria required for the selection of trenchless technology. 24/09/12
- Pérez López, Eloy. Automated design of continuous prestressed-concrete box-girder bridge decks for pedestrian use based on environmental sustainability criteria. 23/07/12
- Rodríguez-Calderita Facundi, Ángel Manuel. Efficient design of post-tensioned slab floors using heuristic optimization based on economic and sustainability criteria. 23/07/12
- Villalba Izquierdo, Pere. Multi-objective heuristic optimization of wide prestressed-concrete slab bridge decks. 23/07/12
- Fernández Serrano, Humberto. Automated design of combined footings based on economic and environmental efficiency criteria. 09/12/11
- Bárcena Saiz, Ángela. Automated design of composite slabs with profiled steel sheeting based on energy-efficiency and economic criteria. 22/09/11
-
- Ahmed Abdelgader, Cheij. Foundation design for the logistics platform on Plot B-2 of the ZAL logistics area (Valencia) using precast piles. 20/07/26
- Gómez Marín, David. Construction Project for the improvement of the eastern access road to the urban area of Enguera (Valencia). 29/06/26
- Tomás Sancho, Antonio. Design of a photovoltaic solar-energy installation to supply electric-vehicle charging points in Quart de Poblet (Valencia). 30/09/25
- Ramírez Fuster, José Alejandro. Studies for the rehabilitation of a bridge and its surrounding road environment on the CV-355 at the entrance to Losilla de Aras de los Olmos (Valencia). 25/09/25
- Payá Ferrada, Tomás. Preliminary Design for site preparation and construction of an industrial building in Jávea (Alicante). 22/09/25
- Tejada Sarsuri, Carlos. Alternatives study and structural design for the widening of the underpasses located at chainages 14+280 and 14+901 of the CV-60 road. Municipality of Castelló de Rugat (Valencia). 18/09/25
- Martín Dapia, Roi. Study for the improvement of cycle and pedestrian mobility on the CV-35 bridge over the Barranco del Remedio in Chelva (Valencia). 24/07/25
- Muñoz Juan, Rubén. Alternatives study and structural design of a steel footbridge providing access to a building from an interior courtyard at CEU San Pablo School in Moncada (Valencia). 26/06/25
- González Castillo, Andrey. Alternatives study and structural design of a cycle-pedestrian bridge over the V-31 motorway in the municipality of Sedaví (Valencia). 26/09/24
- Martínez Mello-Costa, Bruno. Structural design of a suspension footbridge at the mouth of the Cervol River in Vinaroz (Castellón). 26/09/24
- Navarro Esteve, Violant. Structural design of a form traveller for the construction of cable-stayed bridges. 17/07/24
- Sorribes Cerezuela, Sofía. Urban redevelopment project for Vicente Barberá Square in Manises (Valencia). 15/05/24
- Martínez Angulo, Álvaro. Alternatives study for a cycle-pedestrian bridge over a ravine in La Pobla Tornesa (Castellón). 19/12/2023
- Filimonov, Vasilii. Study of the construction scheduling of the pedestrian tunnel connecting the Xàtiva and Alacant stations on the FGV metro network (Valencia). 28/09/23
- Tercero Herreros, Ramón. Design and structural analysis of two steel industrial buildings for a ceramic-tile production plant in the municipality of Vila-Real (Castellón). 01/06/23
- Prats Latorre, Elisa. Preliminary Design of the Mirador de las Dunas viewpoint in Guardamar del Segura (Alicante). 25/05/2023
- Cervera Motos, Francisco. Alternatives study for a cycle-pedestrian bridge over the V-21 in the municipality of Massalfassar (Valencia). 16/09/22
- Mínguez Paredes, Javier. Structural design of a cycle-pedestrian bridge over the V-21 in the municipality of Massalfassar (Valencia). 16/09/22
- Castelló Navarro, Roberto. Alternatives study for the widening of the Camino de Miraflores overpass over the railway on the extension of Avenida Tenor Fleta in Zaragoza. 13/09/22
- Nogueira Serrano, Luis. Design of a runway and aircraft parking apron for emergency-service aircraft in Benagéber (Valencia). 28/07/22
- Pallardó Benavent, Alicia. Structural design of the underpass beneath the CV-400 for Section 2 of the Valencia Metropolitan Green Ring, municipality of Valencia. 24/02/22
- Domínguez Sánchez, Marc. Comparative study of structural design standards: fib, EHE and EC2, applied to the arrivals viaduct at Mahón Airport (Balearic Islands). 22/12/21
- Ballesteros Almonacid, María. Study of the condition of the “tegulación” works for irrigation located on a tributary of the Santa Lucía Chico River, Uruguay. Proposal to remedy the non-compliances identified. 14/09/21
- Chacón Moreno, Jesús Nicolás. Condition assessment and repair design for the bridge on the CV-10 over the Rambla Cervera, between the municipalities of San Mateo and La Jana (Castellón). 20/07/21
- Trejo Ripollés, Carlos Ángel. Structural design of the facilities of a mechanical-transmission manufacturing company located in the Riba-Roja de Túria Logistics Park (Valencia). 29/06/21
- Yepes Bellver, Víctor José. Structural design of a cycle-pedestrian bridge on the Southern Valencia Metropolitan Green Ring over the FGV Valencia–Villanueva de Castellón railway line, at chainage 1.5 of the CV-407 road, municipality of Valencia. 29/06/21
- Prats Palomares, Manolo. Study of structural alternatives for the widening of the existing drainage structure at chainage 21.2 of the CV-14, Barranco del Mas de Fuster, in Zorita del Maestrazgo (Castellón). 09/12/20
- Honrubia Ruiz, Manuel. Technical and economic study of the pavement-rehabilitation works in the Cabanyal district of Valencia. 23/10/20
- Ferrero Montes, Alejandro. Alternatives study using sustainability criteria and Life-Cycle Assessment for a pergola-type overpass on the Madrid–Levante high-speed railway line, in the municipality of Parla (Madrid). 17/09/20
- Fuenmayor Icardo, Miguel Arturo de. Structural study and strength verification of a footbridge over the CV-500 road in Pinedo (Valencia). 23/07/20
- García Cárcel, Alberto. Alternatives study for the footbridge over the CV-500 road in Pinedo (Valencia) using life-cycle assessment and the AHP method. 23/07/20
- Herron Gonzalez, Jorge Luis. Geotechnical design of the foundations of the viaduct over the Guadiana River in Section II of the Badajoz southern bypass. 31/01/20
- Aparisi López, Tatiana. Alternatives study for the viaduct over Arroyo del Cerezo in the widening of the Segovia bypass. Concrete solution. Design basis and structural-action analysis. 20/12/18
- Escamilla Ros, Cristina. Alternatives study for the viaduct over Arroyo del Cerezo in the widening of the Segovia bypass. Concrete solution. Structural verification. 20/12/18
- Pérez-Almazán Piwowarsky, Cristian. Economic feasibility study for the construction of a left-turn lane on Avenida Tarongers, Valencia. 18/12/18
- Zahonero Ruiz, Ángel. Design Project for a steel canopy for vehicle parking in the El Bosque residential development in Chiva (Valencia). 17/09/18
- Delgado Contreras, Gonzalo. Structural design of a hangar located at the cargo terminal of Manises Airport, Valencia. 21/06/18
- Gadea Ferrando, Roger. Preliminary Design of a high-speed railway bridge between chainages 3+005 and 3+070 of the Cáceres–Talayuela railway section in the province of Cáceres. 21/09/17
- Fuster Moragues, Joaquín. Project for the widening of the bridge over the Júcar–Turia Canal located at chainage 42+680, municipality of Picassent (Valencia). 19/09/17
- Casinos Monte, María Isabel. Structural alternatives study for the detention tank for excess flows from the southern sewerage network of Santiago de la Ribera, municipality of San Javier (Murcia). Alternatives analysis. 27/07/17
- Fresneda Expósito, Víctor. Studies for the construction and operation of the SG-20 motorway in the province of Segovia. Drainage and landscape planning. 13/07/17
- Oltra Benavent, Teresa. Studies for the construction and operation of the SG-20 motorway in the province of Segovia. General organization of the works. Structures. 13/07/17
- Aspas García, Marina. New western access to the Santa Clara Industrial Estate in Montalbán, province of Teruel. 10/07/17
- Castro Martín, Noelia. Studies for the construction and operation of the SG-20 motorway in the province of Segovia. Structural maintenance programme. 10/07/17
- Payá Roselló, Jordi. Alternatives study and costed report for precast industrial buildings without a specific use in the Fuente del Jarro Industrial Estate, Paterna (Valencia). 10/07/17
- San Blas Gómez, Borja. Alternatives study and costed report for steel industrial buildings without a specific use in the Fuente del Jarro Industrial Estate, Paterna (Valencia). 10/07/17
- García Fernández, Joel. Alignment-improvement study for the A-1515 road between the A-23 interchange and the municipality of Rubielos de Mora (Teruel). Structural Alternative 1. 22/06/17
- Ruano Cachinero, Carlos. Alignment-improvement study for the A-1515 road between the A-23 interchange and the municipality of Rubielos de Mora (Teruel). Structural Alternative 2. 22/06/17
- Fernández Benítez, Sandra. Studies for the Preliminary Design of the CV-35 bypass through the municipality of Chelva (province of Valencia). Central Alternative. Alternatives study and structural design of the bridge over the Barranco del Montú. 15/06/17
- Cervera Soriano, Elisa. Study for emergency external strengthening of the head tank supplying drinking water to the municipality of Cádiz. 15/12/16
- Sevilla Fernández, José Luís. Project for the reinstatement of the N-8 road at chainage 1003+300 of the Bobadilla–Granada high-speed railway line, municipality of Íllora (Granada). 01/12/16
- Mestre Cotanda, Mireia. Structural design project for the Moncófar WWTP (Castellón). 14/07/16
- Ibáñez, Ignacio. Studies for the Preliminary Design of the CV-35 bypass through the municipality of Chelva (province of Valencia). Central Alternative. Alternatives study and structural design of the bridge over the Barranco del Remedio and the CV-346. 13/07/16
- Ortega Díaz, Carlos. Studies for the Preliminary Design of the CV-35 bypass through the municipality of Chelva (province of Valencia). Central Alternative. Alternatives study and structural design of the bridge at Rincón del Calvo. 13/07/16
- Catalán Pérez, Jorge. Studies for the Preliminary Design of the CV-35 bypass through the municipality of Chelva (province of Valencia). Southern Alternative. Alternatives study and structural design of the first bridge over the Chelva River. 12/07/16
- España Monedero, Fernando. Studies for the Preliminary Design of the CV-35 bypass through the municipality of Chelva (province of Valencia). Southern Alternative. Alternatives study and structural design of the second bridge over the Chelva River. 12/07/16
- Sevilla Fernández, Marcos. Studies for the Preliminary Design of the CV-35 bypass through the municipality of Chelva (province of Valencia). Southern Alternative. Alternatives study and structural design of the bridge over the Barranco del Convento. 12/07/16
- Claramonte Pérez, Sandra. Design Project for a stormwater tank at the Estiviel WWTP in the city of Toledo. 07/07/16
- Kettani, Ismail. Comparative study of the influence of different factors on the design of buried underpass structures. Railway underpasses. Underpass on the Tocón–Valderrubio high-speed railway section, municipality of Obeilar (Granada). 06/07/16
- Montoliu Henares, Gema. Comparative study of the influence of different factors on the design of buried underpass structures. Road underpasses. Underpass on the Mascara Motorway (Algeria). 06/07/16
- Brun Izquierdo, Alejandro. Alternatives study for the structures at the accesses to the new Xirivella Shopping Centre (Valencia). Justification of the adopted solution and cost assessment. 01/07/16
- Yepes Bellver, Lorena. Alternatives study for the structures at the accesses to the new Xirivella Shopping Centre (Valencia). Geotechnical study and comparative analysis. 01/07/16
- Cardona Guerrero, Eduardo Antonio. Studies for the Preliminary Design of the CV-35 bypass through the municipality of Chelva (province of Valencia). Northern Alternative. Alternatives study and structural design of the bridge over the Barranco del Montú. 21/06/16
- Martínez Gandía, Martín. Studies for the Preliminary Design of the CV-35 bypass through the municipality of Chelva (province of Valencia). Northern Alternative. Alternatives study and structural design of the bridge over the Barranco del Remedio and the CV-346. 21/06/16
- Ortuño Ortuño, Antonio. Studies for the Preliminary Design of the CV-35 bypass through the municipality of Chelva (province of Valencia). Northern Alternative. Alternatives study and structural design of the substructures. 21/06/16
- Camarena Escribano, Marina. Competition for the Construction Project of the CV-190 bypass through the municipality of Figueroles (province of Castellón). Northern Alternative. Design and dimensioning of the bridge over the ravine east of Figueroles. 14/06/16
- Natividad Roig, Francisco. Competition for the Construction Project of the CV-190 bypass through the municipality of Figueroles (province of Castellón). Northern Alternative. Design and dimensioning of the bridge over the Lucena River. 04/09/15
- Montenegro Yar, Cristianavid. Structural project for a cross-drainage structure (ODT) over Arroyo del Retortillo and reinstatement of the road at chainage 268.4 of the Madrid–Extremadura high-speed railway line, municipality of Malpartida de Plasencia (Cáceres). 28/01/16
- Sáenz Rada, Asier. Competition for the Construction Project of the CV-190 bypass through the municipality of Figueroles (province of Castellón). Central Alternative. Design and dimensioning of the bridge over the ravine east of Figueroles. 13/07/15
- Sánchez Laosa, Javier. Competition for the Construction Project of the CV-190 bypass through the municipality of Figueroles (province of Castellón). Central Alternative. Design and dimensioning of the bridge over the Lucena River. 13/07/15
- Palao Puche, Juan Pedro. Competition for the Construction Project of the CV-190 bypass through the municipality of Figueroles (province of Castellón). Southern Alternative. Hydraulic design of river-engineering works for the protection of the bridge over the Lucena River. 07/07/15
- Zheng Lu, Jia Wei. Competition for the Construction Project of the CV-190 bypass through the municipality of Figueroles (province of Castellón). Southern Alternative. Structural concept and design of substructures and ancillary structures. 07/07/15
- Zheg Lu, Jia Yi. Competition for the Construction Project of the CV-190 bypass through the municipality of Figueroles (province of Castellón). Southern Alternative. Structural concept and design of the bridge decks over the Lucena River. 07/07/15
- Álvarez Mondaca, Ignacio José. Competition for the Construction Project of the CV-190 bypass through the municipality of Figueroles (province of Castellón). Southern Alternative. Structural concept and design of the bridge deck over the Barranco del Tossal de la Negra. 07/07/15
- Cervera Vallbona, Ana. Project for the reinstatement of the road at chainage 7+129 of the Cocentaina–Muro de Alcoy section of the A-7 motorway. 11/07/14
- Arnau Colomer, Antoni Germà. Project for the reinstatement of the road at chainage 9+220 of the Cocentaina–Muro de Alcoy section of the A-7 motorway. 10/07/14
- Villalba Garzarán, Manuel. Project for the reinstatement of the road at chainage 2+915 of the Cocentaina–Muro de Alcoy section of the A-7 motorway. 08/07/14
- Blasco Cuesta, Francescavid. Project for the reinstatement of the road at chainage 11+557 of the Cocentaina–Muro de Alcoy section of the A-7 motorway. 27/06/14
- Melero Morán, Pablo. Project for the reinstatement of the road at chainage 7+673 of the Cocentaina–Muro de Alcoy section of the A-7 motorway. 27/06/14
- Cabrero García, David. Project for the reinstatement of the road at chainage 10+278 of the Cocentaina–Muro de Alcoy section of the A-7 motorway. 24/06/14
- Chiquillo Ferrándiz, Juan. Project for the reinstatement of the road at chainage 11+446 of the Cocentaina–Muro de Alcoy section of the A-7 motorway. 17/06/14
- Contel Martín, Sara. Study of the structural solution and civil-engineering installations for the bullfighting-event venue in Sarrión, province of Teruel. 25/06/14
-
- Romero Benítez, Keny. Design Project for a drainage structure to restore the Barranco del Retortillo at chainage 210+419 of the Madrid–Extremadura high-speed railway line, in the municipality of Malpartida de Plasencia (Cáceres). 25/09/15
- Salguero Estevan, Alejandro. Construction Project for a forest fire lookout tower in the Carrascal de la Font Roja Natural Park, municipality of Alcoy. 24/09/15
- Bretón Gallén, José Carlos. Design of the bottom-outlet structures and temporary diversion of the Urrobi River at the Nagore auxiliary dam within the Itoiz reservoir, municipality of Nagore (Navarra). 28/09/15
- Gabaldón García, Mízar María. Project for the reinstatement of the Cortijo de Casas Blancas road at chainage 64+590 of the Bobadilla–Granada high-speed railway line, municipality of Íllora (Granada). 25/09/15
- Soria Ros, Enric Josep. Project for widening the crossing over the southern sewer collector on the access road to the Valencia Technical Treatment Centre. 24/09/15
- García Gutiérrez, María de la Concepción. Urban redevelopment project for Unión Musical Square in the municipality of Torrent (Valencia). 18/09/15
- Montes Liébana, Álvaro. Project for the reinstatement of Camino Hondo (CV-234/06) on the Pozo de Urama–Río Cea section of the North/Northwest high-speed railway line, municipality of Grajal de Campo (León). 18/09/15
- Domingo Sánchez, Elena. Study of the dynamic behaviour and track–deck interaction of the Tuela viaducts on the Lubián–Túnel de la Canda section of the North–Northwest high-speed corridor, municipality of Lubián (Zamora). 17/09/15
- Aguilar Martín, Cristina. Underpass project for the reinstatement of Camino de Bigastro at chainage 7+800 of the CV-95 road, municipality of Orihuela (Alicante). 16/09/15
- Arocas Cogolludo, José Manuel. Project for the reinstatement of Camino del Arroyo del Retortillo at chainage 219+330 of the Madrid–Extremadura high-speed railway line, municipality of Malpartida de Plasencia (Cáceres). 16/09/15
- Fuster Tudela, Rhut. Underpass project for the reinstatement of Camí del Ballester at chainage 11+200 of the CV-95 motorway, municipality of Jacarilla (Alicante). 16/09/15
- Lacuesta Martínez, Miguel Ángel. Channelization project for the Barranco de Benimodo in the municipalities of Carlet, Benimodo and L’Alcúdia. 16/09/15
- Marín Atienza, Óscar. Urban development project for the single execution unit of the Playa Sector (SP-1) in El Puig de Santa María (Valencia). 16/09/15
- Lewandowski, Marek Edward. Foundation study for three wind turbines, each with a nominal capacity of 2 MW, at the Czyzewo Wind Farm, municipality of Strzelce Krajenskie, Lubusz Voivodeship (Poland). 24/07/15
- Mayado Navarro, Félix. Underpass project for the reinstatement of Camino de las Romanas on the Madrid–Extremadura high-speed railway line at chainage 253+82, municipality of Malpartida de Plasencia (Cáceres). 24/07/15
- Iserte Michó, Joaquín. Project for the reinstatement of Camino Vereda Zamorana at chainage 64.9 of the Palencia–León high-speed railway line, municipality of Grajal de Campos (León). 17/07/15
- Martínez Santos, José Luis. Structural design project for the pedestrian connection between the platforms of Font de Sant Lluís station in Valencia. 30/06/15
- Lloret Domínguez, Edgar. Bridge project over the Serpis River on the bypass linking the CV-685 and CV-680 roads, municipality of Villalonga (Valencia). 24/06/15
- Laporta Fuster, Eugenio. Comparative study of different construction solutions for the redevelopment of the Ruzafa district in the city of Valencia. 21/05/15
- Penadés Plà, Vicent. Project for the reinstatement of Camino de Grajal de Campos at chainage 58.7 of the Palencia–León high-speed railway line, municipality of Villada (Palencia). 14/05/15
- Ramo Noguera, Arturo. Structural design project for three buildings for the C.E.I.P. in the municipality of Sobradiel (province of Zaragoza). 30/01/15
- Martínez Contel, Aurora de Mediavilla. Project for temporary passenger-service facilities during the works to adapt Zamora railway station for high-speed rail, municipality of Zamora. 12/12/14
- Cáceres Frías, Edgard Josué. Buckling-resistance analysis of mega-columns reinforced with rolled steel sections for tall buildings: application to the Sunning building in the Beijing Metropolitan Area, Beijing (China). 23/10/14
- Llorca Peiró, Cristina. Underpass project for a connecting ramp at chainage 57+250 of the Mediterranean Motorway (A-7), municipality of Cocentaina (Alicante). 23/09/14
- Arnal Roig, Ricardo. Drainage-structure project over Arroyo Valderranas at chainage 48+907 of the Madrid–Galicia high-speed railway line, Palencia–León section, municipality of Villada (Palencia). 17/09/14
- Font Pérez, Alba. Project for the reinstatement of Camino del Convento at chainage 62+390 of the Palencia–León high-speed railway line, municipality of Grajal de Campos (León). 17/09/14
- Sanchis Seco, Marta. Project for the reinstatement of Camino de las Veguillas by means of an underpass at chainage 48+507 of the Madrid–Galicia high-speed railway line, Palencia–León section, municipality of Villada (Palencia). 17/09/14
- Paredes Borrachero, José Manuel. Alternatives study and structural analysis of the structure beneath the tracks for the pedestrian connection between the platforms of the new Zamora high-speed railway station. 09/09/14
- Esteve Vilar, Víctor. Project for the reinstatement of the road at chainage 11+153 of the Cocentaina–Muro de Alcoy section of the A-7 motorway. 15/07/14
- Moreno Placer, Lorena Astrud. Wildlife-crossing project at chainage 90.62 of the Monroyo bypass on the N-232, municipality of Monroyo (Teruel). 15/07/14
- Paz García, Mónica Giuliana. Preliminary Design for improving the crossing over the Serpis River in the vicinity of L’Alqueria d’Asnar (Alicante). 19/05/14
- Macarro Polo, Óscar. Road rehabilitation and pavement-strengthening project for the CV-425 from chainage 21+100 to 25+900 and the CV-428 from chainage 10+250 to 11+300, in the municipalities of Cortes de Pallas and Dos Aguas. 01/04/14
- Solís Brocal, Omar. Project for the reinstatement of Camino de las Umbrías at chainage 121+120 of the A-15 motorway, municipality of Pozalmuro, province of Soria. 27/03/14
- González Tarín, Ismael. Design Project for an industrial building with no specified use in the Castilla Industrial Estate in Cheste (Valencia). 30/01/14
- Solsona Moragas, Natalia. Project for the reinstatement of Camino de la Serrana at chainage 31+000 of the Alicante–Murcia high-speed railway line, municipality of Cox (Alicante). 17/12/13
- Aviñó Rojo, Miquel. Level-crossing removal project by means of a railway underpass at chainage 107+500 of the La Encina–Valencia line, municipality of Alfafar (Valencia). 10/12/13
- Pavía Gómez, Ana. Sports-facilities project for a municipal 11-a-side football pitch in Alfafar (Valencia). 19/11/13
- Ferrandis Gracia, Maria Esther. Underpass project for the reinstatement of the Cañada Real del Puerto del Pico at chainage 38+200 of the A-58 motorway, municipality of Cáceres. 23/09/13
- García Úbeda, Jacobo. Alternatives study for the falsework of the deck of the viaduct over Barranco Hondo de Massegar on the Madrid–Levante New High-Speed Railway Access, Siete Aguas–Bunyol section (Valencia). 23/09/13
- Mokrini, Nabil el. Overpass project at chainage 8+700 of the A-58 motorway from Cáceres to Trujillo, municipality and province of Cáceres. 19/09/13
- Ruiz Sanz, Juan Vicente. Stormwater tank project at the Alguazas wastewater treatment plant (Murcia). 19/09/13
- Moreno Ruiz, Natalia. Project for the portals of the Sorozarreta Tunnel on the New Basque Country Railway Network, Ezkio Itsaso–Beasain section, at chainages 0+807.88 and 2+488.50, municipalities of Ormaitzegi and Beasain (Gipuzkoa). 11/06/13
- Soria Ros, Enric Josep. Underpass project for the reinstatement of Camino de La Estafeta at chainage 8+210 of the CV-95 motorway, municipality of Orihuela (Alicante). 14/05/13
- Casalta Serrano, René. Roundabout project providing access to Industrial Sector S4 at chainage 1+600 of the CV-159, municipality of Cabanes (Castellón). 19/02/13
- Soler Moreno, Carlos. Project for the reinstatement of Camí del Molí at chainage 819+300 of the N-340 road, Albaida bypass, municipality of Atzeneta d’Albaida (Valencia). 23/10/12
- Puche García, Victoria Escolástica. Structural project for the reinstatement of a road at chainage 14.2 of the future CV-95 in the municipality of Orihuela (Alicante). 16/10/12
- López Tomás, Elena. Overpass project at chainage 112+000 of the A-15 motorway, municipality of Ólvega, province of Soria. 11/10/12
- Carrasco Verde, Andrés. Wildlife overpass (ecoduct) project at chainage 124+743 of the A-15 motorway, Villar del Campo–Ágreda section, municipality of Villar del Campo (Soria). 25/09/12
- Matarredona Desantes, Laura. Overpass project over the Alicante–Madrid railway on the southwest urban bypass of Villena (Alicante). 13/09/12
- Miró Monedero, Rafael. Wildlife overpass (ecoduct) project at chainage 119+804 of the A-15 motorway, Villar del Campo–Ágreda section, municipality of Matalebreras (Soria). 11/09/12
- Salas Arias, Fernando Andrés. Design and structural analysis of a drainage structure at chainage 400+200 of the Madrid–Castilla-La Mancha–Valencian Community high-speed railway line, municipality of Almansa (Albacete). 17/07/12
- Gabaldón Garrido, José Miguel. Underpass project for the reinstatement of Vereda de Veguillas at chainage 49+200 of the Madrid High-Speed Railway Access, municipality of Parla (Madrid). 19/06/12
- Botella Andreu, Francisco. Underpass project at chainage 42+500 of the A-58 motorway, municipality and province of Cáceres. 05/06/12
- Miraz, Patricio Guido. Wildlife overpass (ecoduct) project at chainage 121+270 of the A-15 motorway, municipality of Pozalmuro, province of Soria. 05/06/12
- Torres Hernández, Raquel. Culvert project at the crossing of the CV-649 road over the Barranco de la Saladella, municipality of Vallada (Valencia). 05/06/12
- Cifuentes Hortelano, Rocío. Underpass project for the reinstatement of Camino Castañar at chainage 110+450 of the A-15 motorway, municipality of Ólvega (Soria). 15/05/12
- Ciges Navalón, María Luisa. Underpass project providing access to Partida La Carrasca del Rey at chainage 124+410 of the A-15 motorway, municipality of Villar del Campo (Soria). 24/04/12
- Martínez Mínguez, Guillermo. Underpass project for the reinstatement of Camino Largo at chainage 116+250 of the A-15 motorway, municipality of Matalebreras (Soria). 17/04/12
- Sempere Sancho, Silvia. Cross-drainage structure project at chainage 123+800 of the A-15 motorway at its crossing with Arroyo de la Rejera, municipality of Villar del Campo (Soria). 17/04/12
- Sánchez Bermúdez, José Manuel. Overpass project at chainage 4+758 of the A-58 motorway from Cáceres to Trujillo (Cáceres). 15/12/11
- Boix Roca, Miguel. Underpass project for the reinstatement of Camino de la Beguera at chainage 216+780 of the A-15 motorway, municipality of Matalebreras (Soria). 08/11/11
- Gómez Masiá, Adolfo. Overpass project for the reinstatement of Camino Cañada de los Tordejales at chainage 113+940 of the A-15 motorway, municipality of Matalebreras (Soria). 22/09/11
- Montagud Péreze Lis, Santiago. Comparative study of geometric-design sight-distance requirements on curves under Chilean and Spanish standards. 13/07/11
- Oltra Canales, Cristina. Cross-drainage and wildlife-passage project at chainage 109+500 of the Navarra Motorway (A-15), municipality of Ólvega (Soria). 06/07/11
- Martínez Pedro, María Vicenta. Overpass project at chainage 123+600 of the A-15 motorway (Navarra Motorway), municipality of Villar del Campo (Soria). 09/06/11
- Pérez Pastor, Miguel Ángel. Underpass project at chainage 248/110 of the Valencia–Zaragoza railway line in Partida del Juncar (La Masía), municipality of Segorbe (Castellón). 08/06/11
- Prats Padrón, Andrea. Study of the functionality, layout and construction planning of the underground car park located on Avenida Doctor Tomás Sala between San Marcelino Street and Pío IX Street (Valencia). 13/04/11
- Forés Boluña, Eva. Overpass project for the reinstatement of the SO-380 road at chainage 115+200 of the A-15 motorway, municipality of Matalebreras (Soria). 07/04/11
- Ortiz Sanjuán, Salvador. Bridge project over the Soria–Castejón railway at chainage 123+930 of the A-15 motorway, municipality of Villar del Campo (Soria). 31/03/11
- Borillo Llorca, Paula. Overpass project for the reinstatement of Camí de Frangi Baix at chainage 615+123 of the A-7 motorway, municipality of Cocentaina (Alicante). 10/03/11
- Bertomeu Soler, Francesc. Bridge project over the channelized Barranco de Cambró at chainage 3+415 of the CV-50 road, municipality of Tavernes de la Valldigna (Valencia). 17/02/11
- García Segura, Tatiana. Analysis of alignment alternatives and structural design of the interchange between the CV-400 and CV-407 roads in the municipality of Valencia. 23/12/10
- Sobrecases Martí, Salvador. Level-crossing removal project by means of an underpass at chainage 3+153 of Valencia Metro Line 5, Airport–Riba-Roja del Turia section, municipality of Manises (Valencia). 14/12/10
- Garzón Garrigues, Diego. Bridge project over Barranco del Hito at chainage 120+430 of the A-15 motorway, municipality of Matalebreras (Soria). 02/12/10
- Villalba Izquierdo, Pere. Overpass project at chainage 109+380 of the A-15 motorway in the municipalities of Ólvega and Ágreda (Soria). 02/12/10
- Esteban Narro, Ana Araceli. Overpass project for the reinstatement of the CV-705 road at chainage 804+230 of the Mediterranean Motorway (A-7), municipality of Muro de Alcoy (Alicante). 25/11/10
- Pérez Giner, Raúl. Overpass project at chainage 782+000 of the A-7 motorway, municipality of Cocentaina (Alicante). 25/11/10
- Catalán Pellicer, Borja. Rehabilitation and pavement-strengthening of the CV-600 road, section from Llocnou d’en Fenollet to Barxeta (Valencia). 23/11/10
- Carrión Domingo, Francisco. Bridge project over Barranco de Tramusser on the service road of the AP-7/E-15 motorway at chainage 535+500, municipality of Almussafes (Valencia). 21/10/10
- Iborra, Jaume. Rehabilitation project for the CV-345 road, Campo Abajo–Titaguas section, municipalities of Alpuente and Titaguas (province of Valencia). 23/09/10
- Ferrándiz Armero, Juan José. Underpass project for the SO-P-2004 road at chainage 109+700 of the A-15 motorway, municipality of Ólvega (Soria). 21/09/10
- García Fuentes, José Javier. Underpass project at the interchange between the CV-13 and CV-145 roads, municipality of Torreblanca (Castellón). 21/09/10
- Raga Rojas, David. Urban development project for the Fondo de la Litera II Industrial Sector in the municipality of Fraga (Huesca). 21/09/10
- Alfaro Mingot, Ignacio Javier. Bridge project at chainage 236+700 of the N-332 over the channelized Vaca River, municipality of Tavernes de la Valldigna (Valencia). 16/09/10
- Prats Padrón, Ángela. Bridge project over the channelized Barranco de les Fonts for the reinstatement of Camí de les Marjals, municipality of Xeraco (Valencia). 16/09/10
- Vera Saura, José Pedro. Overpass project at chainage 122+400 of the Navarra Motorway A-15, municipality of Pozalmuro (Soria). 16/09/10
- Cazallas Cantero, Manuel Alejandro. Project for the reinstatement of Camino del Convento by means of an underpass at chainage 57+120 of the Northwest High-Speed Railway Corridor, municipality of Grajal de Campos (León). 21/07/10
- Martínez Martínez, Francisco. Underpass project for the reinstatement of the Colada del Monte livestock route at chainage 125+200 of the A-15, municipality of Villar del Campo (Soria). 21/07/10
- Arnau de Gracia, María Beatriz. Structural project for the extension of the Laboratory Building of the Faculty of Civil Engineering at the Technical University of Ostrava. 14/07/10
- González García, Javier. Underpass project at chainage 75+570 of the Palencia–León high-speed railway line for the reinstatement of a transverse road, municipality of El Burgo Ranero (León). 23/06/10
- López Gervasio, Ana Patricia. Structural design of the extension to the Dining Hall Building of the Faculty of Civil Engineering at the Technical University of Ostrava. 09/06/10
- Sánchez Sánchez, David. Underpass project for the reinstatement of Camino Hondo at chainage 56+350 of the Northwest High-Speed Railway Corridor, municipality of Grajal de Campos, province of León. 09/06/10
- Segado Jiménez, Saray. Underpass project at chainage 47+400 of the Bobadilla–Granada branch of the Madrid–Granada high-speed railway line, municipality of Íllora (Granada). 12/05/10
- Barbier, Antoine. Overpass project at chainage 13+730 of the CV-13 motorway, municipality of Benlloch (Castellón). 15/04/10
- Escribano Carramolino, Javier. Project for the reinstatement of Carrer dels Pous on the Airport–Riba-Roja section of Metrovalencia Line 5, municipality of Riba-Roja del Turia (Valencia). 24/03/10
- Pérez Díez, María del Carmen. Structural project for the landscaping works around Sangueta station on Avenida de la Vila Joiosa, municipality of Alicante. 20/01/10
- Ribes Pascual, Adrián. Overpass project at chainage 802+688 of the future A-7 motorway, municipality of Muro de Alcoy (Alicante). 22/10/09
- Vélez Gómez, María Isabel. Overpass project for the reinstatement of a road at chainage 26+800 of the Turia Motorway CV-35, municipality of Llíria, province of Valencia. 17/09/09
- García Benavent, Juan. Underpass project for the reinstatement of the Reguerón del Hurchillo service roads at chainage 5+200 of the CV-95 motorway, municipality of Orihuela (Alicante). 09/09/09
- Espín Fernández, María del Mar. Overpass project at chainage 33+000 of the A-58 Trujillo–Cáceres motorway, municipality of Cáceres. 14/07/09
- Joueidi, Jamal. Overpass project at chainage 16+400 of the CV-95 motorway for the reinstatement of the CV-940, municipality of San Miguel de Salinas (Alicante). 14/07/09
- Martín Hernández, Andrés. Underpass project at chainage 390+200 of the A-23 motorway, Lanave–Jabarrella Reservoir section, municipality of Sabiñánigo (Huesca). 08/07/09
- Sancho Ortiz, Antonio. Road-reinstatement project for the crossing of the CV-95 at chainage 8+365, municipality of Jacarilla (Alicante). 08/07/09
- Marco Miguel, Sergio. Overpass project at chainage 803+441 of the future A-7 motorway, municipality of Muro de Alcoy (Alicante). 02/07/09
- Soler Montolio, Francisco Javier. Bridge project over Barranco de Grifo at chainage 29.450 of the new A-70/E-15 motorway, municipality of Elche (Alicante). 18/06/09
- Martínez Arguisuelas, Alberto. Underpass project at chainage 7+788 of the Airport–Riba-Roja del Turia section beneath Valencia Metro Line 5, municipality of Riba-Roja del Turia, province of Valencia. 27/05/09
- Montolio Barrachina, Sergio. Irrigation-reservoir project for the Real Acequia de Moncada Irrigation Community in the municipality of Museros (Valencia). 27/05/09
- Palerm Sabater, Blanca. Overpass project at the Llocnou de Sant Jeroni interchange, chainage 26.5 of the CV-60, municipality of Llocnou de Sant Jeroni, province of Valencia. 21/05/09
- Martínez Falcó, Iván Bernardo. Underpass project for the reinstatement of Camino Cañada Real del Puerto at chainage 787.035 of the N-340, municipality of Alcoy (Alicante). 04/03/09
- Pérez Rodríguez, María del Carmen. Structural project for the interchange between the CV-95 and CV-945 at chainage 13+250, municipality of Orihuela (Alicante). 26/02/09
- Ruiz Castelló, Joan. Underpass project on Calle Alicante to connect the future Central Station with Calle Segorbe in the city of Valencia. 04/02/09
- Marqués Casamayor, Victoria. Stormwater-collector project for the Margen Sur development, 4th phase, Camí la Mar, Sagunto (Valencia). 08/07/08
- Masià Fornés, Verónica. Underpass project for Camino de San Vicente beneath the Madrid–Alicante high-speed railway line, municipality of Monforte del Cid (Alicante). 01/07/08
- Planelles Beltran, Vicente. Project for the reinstatement of a road at chainage 17+370 of the future CV-95 motorway, municipality of San Miguel de Salinas (Alicante). 24/06/08
- Tejedor Mardomingo, Ignacio. Overpass project at chainage 993.457 of the N-340, Torre la Sal interchange, municipality of Cabanes (Castellón). 06/03/08
- Salaix Rochera, Carlos-Rafael. Urban development project for the C.D. Castellón sports complex located in Partida Magdalena (Castellón). 23/10/07
- Silvestre Martínez, Ramón. Road-access project for the new hospital in Dénia (Alicante). 25/09/07
- Serrano Gimeno, Ángel. Overpass project at chainage 400.7 of the New Levante High-Speed Railway Access in Venta del Moro (Valencia). 13/09/07
- Rivero Barquín, Álvaro. Overpass project over the Xàtiva–Alcoi railway on the northern bypass of Xàtiva (province of Valencia). 19/07/07
- Attas, David. Bridge project over the Faitanar irrigation channel on Don Carlos Dinnbier Street, Molí d’Animeta Sector, Quart de Poblet (Valencia). 02/07/07
- Díaz Gil, Raúl. Overpass project at the access to the Riodel Industrial Estate, chainage 94.0 of the CN-340, Mutxamel (Alicante). 29/03/07
- Ferrando Fons, José Miguel. Bridge project over Barranco de L’Angeliu on the northern bypass of Xàtiva (Valencia). 29/03/07
- Romeu Mont, Óscar. Overpass project over the future Valencia–Castellón high-speed railway line at the accesses to the Golf Mar residential development, El Puig (Valencia). 29/03/07
- Méndez García, Enrique. Structural project for the reinstatement of Vereda del Cid at chainage 403+100 of the Madrid–Alicante high-speed railway line, municipality of Monforte del Cid (Alicante). 27/03/07
- Mascarós Villanueva, Montserrat. Bridge project over Barranco de Porxinos on the CV-370, Riba-Roja del Turia bypass (Valencia). 22/03/07
- López López, Jerónimo. Viaduct project over the Albaida River at chainage 601.5 of the Muro de Alcoy–Puerto de Albaida section of the N-340, Albaida (Valencia). 14/12/06
- Baixauli Pérez, Vicente. Preliminary project for the dualling of the CV-222 road, Betxí–Alquerías del Niño Perdido section (Castellón). 19/10/06
- Torres Machí, Diego. Overpass project at chainage 407.1 of the New Levante High-Speed Railway Access in Caudete de las Fuentes (Valencia). 28/09/06
- Vilaplana Mora, José Miguel. Overpass project at chainage 5+400 of the CN-332 bypass between Ondara and Vergel, Ondara (Valencia). 28/09/06
- Trujillo Seguí, Jaime. Bridge project over the N-340 at chainage 605.8, Puerto de Albaida (Albaida, Valencia). 14/09/06
- Menchón Bofill, Alberto. Overpass project at chainage 409.3 of the New Levante High-Speed Railway Access, Caudete de las Fuentes (Valencia). 20/07/06
- Piqueras García, Miguel Ángel. Overpass project at chainage 1+100 of the motorway connecting the Southern Distributor with the A-7, municipality of Aldaya (Valencia). 12/01/06
- Ortín Grau, Miguel. Overpass project at chainage 4+500 of the connection between the Southern Distributor and the A-7 in Aldaia (Valencia). 13/10/05
- Rodrigo Balaguer, María Desamparados. Overpass project at chainage 0+640 of the A-8 motorway, Tamón (Asturias). 28/07/05
- Ortega García, Manuel. Overpass project at chainage 0+131 of the Tamón–Villalegre section of the Cantabrian Motorway (Asturias). 23/06/05
- Auñón Valero, Ramón. Eastern bypass project for Macastre (Valencia). 09/06/05
- Paredes Fernández, Carolina. Overpass project at chainage 2+900 of the motorway connecting the Southern Distributor with the A-7, Aldaia (Valencia). 19/05/05
- Fernandez Carrión, Rocio. Collaboration in the execution of the diversion of arterial pipelines in the Airport and Manises area. 10/04/02
Participation in teaching innovation projects
-
Excellence and Innovation in the learning process of the design–construction process in Civil Engineering (EXCELCON). EICE. 01/09/2013–31/08/2014. 2013, 2014, 2015, 2016, 2017 and 2018.
-
Introduction of professional responsibility into the Bachelor’s Degree in Public Works Engineering (B04/13). PIME. 01/09/2013–31/08/2014. 2013.
-
Case-study learning based on a construction project as a teaching strategy and as a means of coordinating specific and generic competences among postgraduate subjects in construction management (B01/12). PIME. 01/09/2012–31/08/2013. 2012.
-
Excellence and Innovation in the learning process of the design–construction process in Civil Engineering (EXCELCON). EICE. 01/09/2012–31/08/2013. 2012.
-
Excellence and Innovation in the learning process of the design–construction process in Civil Engineering (EXCELCON). EICE. 01/09/2011–31/08/2012. 2011.
-
Teaching Innovation Group (PACE). 2009.
Research
ResearcherID: L-1774-2014 (Web of Science)
UNESCO codes
3305 Construction Technology:- 3305.04 Bridges
- 3305.05 Concrete Technology
- 3305.06 Civil Engineering
- 3305.10 Foundations
- 3305.24 Prefabricated Construction
- 3305.25 Prestressed Concrete
- 3305.32 Structural Engineering
Publications in JCR-indexed journals
-
ZHOU, Z.; DING, F.; ALCALÁ, J.; YEPES, V. (2026).
Thermal damage
and lifespan deterioration of global infrastructure under climate
warming.
Thermal Science and Engineering Progress, (accepted, in
press).
DOI:https://doi.org/10.2139/ssrn.6598244 -
YEPES-BELLVER, L.; ALCALÁ, J.; YEPES, V. (2026).
Multicriteria
Analysis of Cost, CO2 Emissions, and Embodied Energy for Post-tensioned
Slab Bridges Using the CRITIC Method.
Hormigón y Acero,
DOI:https://doi.org/10.33586/hya.2026.4176 -
RUIZ-VÉLEZ, A.; SÁNCHEZ-GARRIDO, A.J.; ALCALÁ, J.; YEPES, V. (2026).
Life-cycle environmental and social trade-offs in concrete road
frame systems.
Cleaner Environmental Systems, 22:100462.
DOI:https://doi.org/10.1016/j.cesys.2026.100462 -
ZHOU, Z.; ZHAO, Z.; ALCALÁ, J.; YEPES, V. (2025).
Intelligent
operation monitoring and finite element coupled identification of
hyperstatic structures.
Results in Engineering 27:106990
DOI:https://doi.org/10.1016/j.rineng.2025.106990 -
YEPES-BELLVER, L.; ALCALÁ, J.; YEPES, V. (2025).
Predictive
modeling for carbon footprint optimization of prestressed road
flyovers.
Applied Sciences, 15(17), 9591.
DOI:https://doi.org/10.3390/app15179591 -
ZHOU, Z.; TIAN, Q.; ALCALÁ, J.; YEPES, V. (2025).
Research on the
coupling of talent cultivation and reform practice of higher education
in architecture.
Computers and Education Open,
DOI:https://doi.org/10.1016/j.caeo.2025.100268 -
ZHOU, Z.; WANG, Y.; YEPES-BELLVER, L.; ALCALÁ, J.; YEPES, V. (2025).
Intelligent monitoring of loess landslides and research on
multi-factor coupling damage.
Geomechanics for Energy and the
Environment 42, 100692.
DOI:https://doi.org/10.1016/j.gete.2025.100692 -
ZHOU, Z.; YEPES-BELLVER, L.; ALCALÁ, J.; YEPES, V. (2025).
Study
on the Failure Mechanism of Deep Foundation Pit of High-Rise Building:
Comprehensive Test and Microstructure Coupling.
Buildings 2025,
15(8), 1270.
DOI:https://doi.org/10.3390/buildings15081270 -
YEPES-BELLVER, L.; BRUN-IZQUIERDO, A.; ALCALÁ, J.; YEPES, V. (2025).
Surrogate-assisted cost optimization for post-tensioned concrete
slab bridges
. Infrastructures, 10(2): 43.
DOI:https://doi.org/10.3390/infrastructures10020043 -
YUJUN, L.; ZHOU, Z.; ALCALÁ, J.; YEPES, V. (2025).
Research on
spatial deformation monitoring and numerical coupling of deep foundation
pit in soft soil
. Journal of Building Engineering, 99:111636.
DOI:https://doi.org/10.1016/j.jobe.2024.111636 -
ZHOU, Z.; LIANG, Z.; ALCALÁ, J.; YEPES, V. (2024).
Three-dimensional finite element coupled optimization assessment of
extra-large bridges.
Structures, 70:107743.
DOI:https://doi.org/10.1016/j.istruc.2024.107743 -
YEPES-BELLVER, L.; BRUN-IZQUIERDO, A.; ALCALÁ, J.; YEPES, V. (2024).
Artificial neural network and Kriging surrogate model for embodied
energy optimization of prestressed slab bridges.
Sustainability,
16(19), 8450.
DOI:https://doi.org/10.3390/su16198450 -
RUIZ-VÉLEZ, A.; GARCÍA, J.; PARTSKHALADZE, G.; ALCALÁ, J.; YEPES, V.
(2024).
Enhanced Structural Design of Prestressed Arched Trusses
through Multi-Objective Optimization and MCDM.
Mathematics, 12(16),
2567.
DOI:https://doi.org/10.3390/math12162567 -
ZHOU, Z.; WANG, Y.; ALCALÁ, J.; YEPES, V. (2024).
Research on
coupling optimization of carbon emissions and carbon leakage in
international construction projects.
Scientific Reports, 14:
10752.
DOI:https://doi.org/10.1038/s41598-024-59531-4 -
RUIZ-VÉLEZ, A.; GARCÍA, J.; ALCALÁ, J.; YEPES, V. (2024).
Enhancing Robustness in Precast Modular Frame Optimization:
Integrating NSGA-II, NSGA-III, and RVEA for Sustainable
Infrastructure.
Mathematics, 12(10):1478.
DOI:https://doi.org/10.3390/math12101478 -
NAVARRO, I.J.; VILLALBA, I.; YEPES-BELLVER, L.; ALCALÁ, J. (2024).
Social life cycle assessment of railway track substructure
alternatives.
Journal of Cleaner Production, 450 (2024)
142008.
DOI:https://doi.org/10.1016/j.jclepro.2024.142008 -
RUIZ-VÉLEZ, A.; GARCÍA, J.; ALCALÁ, J.; YEPES, V. (2024).
Sustainable road infrastructure decision-making: Custom NSGA-II with
repair operators for multi-objective optimization.
Mathematics,
12(5):730.
DOI:https://doi.org/10.3390/math12050730 -
ZHOU, Z.; ZHOU, J.; ZHANG, B.; ALCALÁ, J.; YEPES, V. (2024).
The
centennial sustainable assessment of regional construction industry
under the multidisciplinary coupling model.
Sustainable Cities and
Society (11)1 - 21.
DOI: 10.1016/j.scs.2024.105201 -
ZHOU, Z.; ZHOU, J.; ALCALÁ, J.; YEPES, V. (2024).
Thermal
coupling optimization of bridge environmental impact under natural
conditions.
Environmental Impact Assessment Review,
104:107316.
DOI:https://doi.org/10.1016/j.eiar.2023.107316 -
YEPES-BELLVER, L.; BRUN-IZQUIERDO, A.; ALCALÁ, J.; YEPES, V. (2023).
Embodied energy optimization of prestressed concrete road flyovers
by a two-phase Kriging surrogate model.
Materials, 16(20);
6767.
DOI:https://doi.org/10.3390/ma16206767 -
ZHOU, Z.; ALCALÁ, J.; YEPES, V. (2023).
Carbon impact assessment
of bridge construction based on resilience theory.
Journal of Civil
Engineering and Management, 29(6):561-576.
DOI:https://doi.org/10.3846/JCEM.2023.19565 -
ZHOU, Z.; ALCALÁ, J.; YEPES, V. (2023).
Experimental Research on
Diseases of Emulsified Asphalt Mortar Board for Ballastless Tracks.
Journal of Materials in Civil Engineering, 35(6):04023156.
DOI:https://doi.org/10.1061/JMCEE7.MTENG-15149 -
RUIZ-VÉLEZ, A.; ALCALÁ, J.; YEPES, V. (2023).
A parametric study
of optimum road modular hinged frames by hybrid metaheuristics.
Materials, 16(3):931.
DOI:https://doi.org/10.3390/ma16030931 -
RUIZ-VÉLEZ, A.; ALCALÁ, J.; YEPES, V. (2022).
Optimal design of
sustainable reinforced concrete precast hinged frames.
Materials,
16(1):204.
DOI:https://doi.org/10.3390/ma16010204 -
PARTSKHALADZE, G.; ALCALÁ, J.; MEDZMARIASHVILI, E.; CHAVLESHVILI, G.;
SURGULADZE, B., I.; YEPES, V. (2022).
Heuristic Optimization of a
New Type Prestressed Arched Truss.
Materials, 15(22): 8144.
DOI:https://doi.org/10.3390/ma15228144 -
ZHOU, Z.; ALCALÁ, J.; YEPES, V. (2022).
Research on the optimized
environment of large bridges based on multi-constraint coupling.
Environmental Impact Assessment Review, 97:106914.
DOI:https://doi.org/10.1016/j.eiar.2022.106914 -
YEPES-BELLVER, L.; BRUN-IZQUIERDO, A.; ALCALÁ, J.; YEPES, V. (2022).
CO2-optimization of post-tensioned concrete slab-bridge decks using
surrogate modeling.
Materials, 15(14):4776.
DOI:https://doi.org/10.3390/ma15144776 -
MARTÍNEZ-MARTÍN, F.J.; YEPES, V.; GONZÁLEZ-VIDOSA, F.; HOSPITALER,
A.; ALCALÁ, J. (2022).
Optimization design of RC elevated water
tanks under seismic loads.
Applied Sciences, 12(11):5635.
DOI:https://doi.org/10.3390/app12115635 -
ZHOU, Z.; ALCALÁ, J.; YEPES, V. (2022).
Regional sustainable
development impact through sustainable bridge optimization.
Structures, 41, 1061-1076.
DOI: 10.1016/j.istruc.2022.05.047 -
ZHOU, Z.; ALCALÁ, J.; YEPES, V. (2021).
Optimized application of
sustainable development strategy in international engineering project
management.
Mathematics, 9(14):1633.
DOI:https://doi.org/10.3390/math9141633 -
ZHOU, Z.; ALCALÁ, J.; KRIPKA, M.; YEPES, V. (2021).
Life cycle
assessment of bridges using Bayesian Networks and Fuzzy
Mathematics.
Applied Sciences, 11(11):4916.
DOI:https://doi.org/10.3390/app11114916 -
ZHOU, Z.; ALCALÁ, J.; YEPES, V. (2021).
Environmental, economic
and social impact assessment: study of bridges in Chinas five major
economic regions.
International Journal of Environmental Research
and Public Health, 18(1):122.
DOI:https://doi.org/10.3390/ijerph18010122 -
ZHOU, Z.; ALCALÁ, J.; YEPES, V. (2020).
Bridge Carbon Emissions
and Driving Factors Based on a Life-Cycle Assessment Case Study:
Cable-Stayed Bridge over Hun He River in Liaoning, China.
International Journal of Environmental Research and Public Health,
17(16):5953.
DOI:https://doi.org/10.3390/ijerph17165953 -
PARTSKHALADZE, G.; MSHVENIERADZE, I.; MEDZMARIASHVILI, E.;
CHAVLESHVILI, G.; YEPES, V.; ALCALÁ, J. (2019).
Buckling Analysis
and Stability of Compressed Low Carbon Steel Rods in Elasto-Plastic
Region of Material.
Advances in Civil Engineering, 2019:
7601260.
DOI:https://doi.org/10.1155/2019/7601260 -
GARCÍA-SEGURA, T.; YEPES, V.; ALCALÁ, J.; PÉREZ-LÓPEZ, E. (2015).
Hybrid harmony search for sustainable design of post-tensioned
concrete box-girder pedestrian bridges
. Engineering Structures,
92:112-122.
DOI:https://doi.org/10.1016/j.engstruct.2015.03.015 -
GARCÍA-SEGURA, T.; YEPES, V.; MARTÍ, J.V.; ALCALÁ, J. (2014).
Optimization of concrete I-beams using a new hybrid glowworm swarm
algorithm.
Latin American Journal of Solids and Structures,
11(7):1190-1205.
DOI:https://doi.org/10.1590/S1679-78252014000700007 -
GARCÍA-SEGURA, T.; YEPES, V.; ALCALÁ, J. (2014).
Life-cycle
greenhouse gas emissions of blended cement concrete including
carbonation and durability.
International Journal of Life Cycle
Assessment. 19(1):3-12.
DOI:https://doi.org/10.1007/s11367-013-0614-0 - TORRES-MACHÍ, C.; YEPES, V.; ALCALÁ, J.; PELLICER, E. (2013). Optimization of high-performance concrete structures by variable neighborhood search. International Journal of Civil Engineering, 11(2):90-99.
-
MARTÍ, J.V.; GONZÁLEZ-VIDOSA, F.; YEPES, V.; ALCALÁ, J. (2013).
Design of prestressed concrete precast road bridges with hybrid
simulated annealing.
Engineering Structures., 48:342-352.
DOI:https://doi.org/10.1016/j.engstruct.2012.09.014 -
YEPES, V.; GONZÁLEZ-VIDOSA, F.; ALCALÁ, J.; VILLALBA, P. (2012).
CO2-Optimization Design of Reinforced Concrete Retaining Walls based
on a VNS-Threshold Acceptance Strategy.
Journal of Computing in
Civil Engineering, 26 (3):378-386.
DOI:https://doi.org/10.1061/(ASCE)CP.1943-5487.0000140 -
MARTINEZ, F.J.; GONZÁLEZ-VIDOSA, F.; HOSPITALER, A.; ALCALÁ, J.
(2011).
Design of tall bridge piers by ant colony optimization.
Engineering Structures, 33(8):2320-2329.
DOI:https://doi.org/10.1016/j.engstruct.2011.04.005 - PEREA, C.; YEPES, V.; ALCALÁ, J.; HOSPITALER, A.; GONZÁLEZ-VIDOSA, F. (2010). A parametric study of optimum road frame bridges by threshold acceptance. Indian Journal of Engineering & Materials Sciences, 17(6):427-437.
- YEPES, V.; DÍAZ, J.; GONZÁLEZ-VIDOSA, F.; ALCALÁ, J. (2009). Statistical Characterization of Prestressed Concrete Road Bridge Decks. Revista de la Construcción, 8(2):95-109.
-
YEPES, V.; ALCALÁ, J.; PEREA, C.; GONZÁLEZ-VIDOSA, F. (2008).
A
Parametric Study of Optimum Earth Retaining Walls by Simulated
Annealing.
Engineering Structures, 30(3): 821-830.
DOI:https://doi.org/10.1016/j.engstruct.2007.05.023 -
PEREA, C.; ALCALÁ, J.; YEPES, V.; GONZÁLEZ-VIDOSA, F.; HOSPITALER, A.
(2008).
Design of Reinforced Concrete Bridge Frames by Heuristic
Optimization.
Advances in Engineering Software, 39(8):
676-688.
DOI:https://doi.org/10.1016/j.advengsoft.2007.07.007
Other publications
- RUIZ-VÉLEZ, A.; ALCALÁ, J.; KRIPKA, M.; YEPES, V. Perspectiva social de un marco modular óptimo: análisis integral del ciclo de vida. . Revista CIATEC-UPF, 15(1), 1-19. DOI:https://doi.org/10.5335/ciatec.v15i1.14974
-
YEPES, V.; PÉREZ-LÓPEZ, E.; GARCÍA-SEGURA, T.; ALCALÁ, J. (2019).
Optimization of high-performance concrete post-tensioned box-girder
pedestrian bridges.
International Journal of Computational Methods
and Experimental Measurements, 7(2):118-129.
DOI: 10.2495/CMEM-V7-N2-118-129 -
YEPES, V.; PÉREZ-LÓPEZ, E.; ALCALÁ, J.; GARCÍA-SEGURA, T. (2018).
Parametric study of concrete box-girder footbridges. Journal of
Construction Engineering.
Management & Innovation,
1(2):67-74.
DOI:https://doi.org/10.31462/jcemi.2018.01067074 -
ALCALÁ, J.; GONZÁLEZ-VIDOSA, F.; YEPES, V.; MARTÍ, J.V. (2018).
Embodied energy optimization of prestressed concrete slab bridge
decks.
Technologies, 6(2):43.
DOI:https://doi.org/10.3390/technologies6020043 - GARCÍA-SEGURA, T.; YEPES, V.; ALCALÁ, J. (2017). Computer-support tool to optimize bridges automatically. International Journal of Computational Methods and Experimental Measurements, 5(2):171-178.
- TORRES-MACHÍ, C.; YEPES, V.; ALCALÁ, J.; PELLICER, E. (2013). Integración de investigación y docencia de posgrado a través del diseño eficiente de estructuras. MSEL Modelling in Science Education and Learning, 6(3), No.8. ISSN: 1988-3145.
- YEPES, V.; ALCALÁ, J.; DÍAZ, J.; GONZÁLEZ-VIDOSA, F. (2011). Morfología de tableros aligerados de canto constante postesados para puentes carreteros y ferroviarios . Ingeniería Civil, 161:61-72. [Post-stressed constant depth beam concrete road and railway bridge voided decks morphology].
- CARBONELL, A.; ALCALÁ, J.; GONZÁLEZ-VIDOSA, F.; YEPES, V. (2007). Optimización heurística de bóvedas de hormigón armado para pasos de carreteras. Ingeniería Civil, 145: 79-88. ISSN: 0213-8468
- YEPES, V.; ALCALÁ, J.; PEREA, C.; GONZÁLEZ-VIDOSA, F. (2006). Estudio paramétrico de muros óptimos de contención de hormigón armado. Ingeniería Civil, 142: 129-139. ISSN: 0213-8468. [A parametric study of optimum reinforced concrete retaining walls].
- CARRERA, J.M.; ALCALÁ, J.; YEPES, V.; GONZÁLEZ-VIDOSA, F. (2005). Optimización heurística de pórticos de paso de carretera de hormigón armado. Hormigón y Acero, 236: 85-95. ISSN: 0439-5689.
- ALCALÁ, J.; CARRERA, J.M.; GONZÁLEZ-VIDOSA, F.; YEPES, V. (2005). Cristalización simulada aplicada a la optimización económica de muros ménsula de contención de hormigón armado. Hormigón y Acero, 236: 97-108. ISSN: 0439-5689.
Conference contributions
- GONZÁLEZ-VIDOSA, F.; ALCALÁ, J.; NAVARRO, F. (2020) On the structural design of characteristic decks for three-span postensioned road flyovers. 10th International Conference on High Performance and Optimum Design of Structures and Materials (HPSM/OPTI 2020)
- MOLINA-JOTEL, V.; ALCALÁ, J.; MARTÍ, J.V.; YEPES, V. (2017). Diseño de pasarelas de hormigón postesado de sección en T mediante optimización heurÍstica bajo criterios económicos y de sostenibilidad. VII Congreso de ACHE, A Coruña, junio.
- YEPES, V.; GONZÁLEZ-VIDOSA, F.; MARTÍ, J.V.; ALCALÁ, J.; PELLICER, E. (2017). Puentes pretensados de alta eficiencia social y medioambiental bajo presupuestos restrictivos: Proyecto BRIDLIFE . VII Congreso de ACHE, A Coruña, junio.
- MARTÍ, J.V.; ALCALÁ, J.; GARCÍA-SEGURA, T.; YEPES, V. (2016). Heuristic design of precast-prestressed concrete U-beam and post-tensioned cast-in-place concrete slab road bridges. HPSM/OPTI 2016. WIT Transactions on The Built Environment, Vol 166. ISNB: 978-1-78466-143-4.
- GARCÍA-SEGURA, T.; YEPES, V.; MARTÍ, J.V.; ALCALÁ, J. (2015). Algoritmo híbrido de enjambre de luciérnagas y aceptación por umbrales para diseño de vigas. X Congreso Español de Metaheurísticas, Algoritmos Evolutivos y Bioinspirados. MAEB 2015, 4–6 February, Mérida, pp. 699-705. ISSN: 978-84-697-2150-6.
- ALCALÁ, J.; YEPES, V.; MARTÍ, J.V.; BÁRCENA, A. (2014). Diseño automático de forjados mixtos con chapa nervada, basado en criterios de eficiencia energética y económicos. VI Congreso de ACHE, 3–5 June, Madrid. ISSN: 978-84-89670-80-8.
- ALCALÁ, J.; YEPES, V.; MARTÍ, J.V.; RODRÍGUEZ-FACUNDI, A. (2014). Optimización de forjados de losa pretensada utilizando criterios económicos y de sostenibilidad. VI Congreso de ACHE, 3–5 June, Madrid. ISSN: 978-84-89670-80-8.
- GARCÍA-SEGURA, T.; YEPES, V.; ALCALÁ, J. (2014). Sustainable design using multiobjective optimization of high-strength concrete I-beams. The 2014 International Conference on High Performance and Optimum Design of Structures and Materials HPSM/OPTI 2014, 9-11 June, Ostend, Belgium. WIT Transactions on The Built Environment, Vol 137, pp. 347-358. doi: 10.2495/HPSM140331 (link)
- GARCÍA-SEGURA, T.; YEPES, V.; ALCALÁ, J. (2014). Life-cycle emissions of reinforced concrete made with blended cements. 18th International Congress on Project Management and Engineering. 16–18 July, Alcañiz (Teruel), pp. 1-10. ISSN: 978-84-617-2742-1.
- GARCÍA-SEGURA, T.; YEPES, V.; ALCALÁ, J.; MARTÍ, J.V. (2014). Optimización multiobjetivo para el estudio de la sostenibilidad del hormigón autocompactante. VI Congreso de ACHE, 3–5 June, Madrid. ISSN: 978-84-89670-80-8.
- GARCÍA-SEGURA, T.; YEPES, V.; ALCALÁ, J.; MARTÍ, J.V. (2014). Influencia de la carbonatación y durabilidad en el ciclo de vida del hormigón fabricado con cementos con adiciones. VI Congreso de ACHE, 3–5 June, Madrid. ISSN: 978-84-89670-80-8.
- MARTÍ, J.V.; YEPES, V.; ALCALÁ, J.; GONZÁLEZ-VIDOSA, F. (2014). Diseño de tableros isostáticos de puentes de vigas artesa prefabricadas pretensadas con criterios económicos. VI Congreso de ACHE, 3–5 June, Madrid. ISSN: 978-84-89670-80-8.
- YEPES, V.; MARTÍ, J.V.; ALCALÁ, J.; GARCÍA-SEGURA, T. (2014). Diseño eficiente de estructuras con hormigones no convencionales basados en criterios sostenibles multiobjetivo: HORSOST. VI Congreso de ACHE, 3–5 June, Madrid. ISSN: 978-84-89670-80-8.
- ALCALÁ, J.; MARTÍ, J.V.; YEPES, V. (2013). CO2 optimization of precast-prestressed concrete road bridges with steel fiber-reinforcement. 5th International Congress on Energy and Environment Engineering and Management. Lisbon, 17-19 July 2013, CD. ISSN: 978-989-98406-5-2
- YEPES, V.; ALCALÁ, J.; GARCÍA-SEGURA, T. (2013). Multiobjective optimization of high-performance reinforced concrete I-beams by simulated annealing. 22nd International Conference on Multiple Criteria Decision Making, 17-21 June, Málaga, (Spain).
- MARTÍ, J.V.; ALCALÁ, J.; YEPES, V.; GONZÁLEZ-VIDOSA, F. (2012). Diseño heurístico de puentes de hormigón pretensado como ejemplo de docencia en posgrado. XVI Congreso Internacional de Ingeniería de Proyectos, AEIPRO, 11–13 July, Valencia, pp. 2345-2356
- MARTÍ, J.V.; YEPES, V.; GONZÁLEZ-VIDOSA, F.; ALCALÁ, J. (2012). CO2-Optimization of PC precast bridges by hybrid heuristics. SSCS 2012 Numerical Modeling. Strategies for Sustainable Concrete Structures, May 29-June 1, Aix-en-Provence, France.
- MARTÍ, J.V.; ALCALÁ, J.; YEPES, V. (2012). Diseño automatizado mediante optimización heurística de tableros de puentes pretensados: losas continuas aligeradas y vigas artesa prefabricadas. VI Congreso Nacional de la Ingeniería Civil, 23–24 February, Valencia. ISNB: 978-84-380-0452-4.
- YEPES, V.; VILLALBA, P.; ALCALÁ, J.; GONZÁLEZ-VIDOSA, F. (2011). Energy consumption optimization design of prestressed concrete slab bridge decks , in Proceedings of 4th International Congress on Energy and Environment Engineering and Management, 26-27 May, Mérida (Spain), pp. 153. ISSN: 978-84-9978-014-6.
- YEPES, V.; ALCALÁ, J.; GONZÁLEZ-VIDOSA, F. (2011). Caracterización multifactorial de tableros aligerados de canto constante optimizados mediante técnicas heurísticas. V Congreso de ACHE, Barcelona, 10 pp.
- ALCALÁ, J.; VILLALBA, P.; YEPES, V.; GONZÁLEZ-VIDOSA, F. (2011). CO2 Optimization of Prestressed Concrete Slab Bridge Decks by Simulated Annealing, in Abstracts of Optimization 2011, Portuguese Operational Research Society, Lisbon, pp. 82.
- VILLALBA, P.; ALCALÁ, J.; YEPES, V.; GONZÁLEZ-VIDOSA, F. (2010). CO2 optimization of reinforced concrete cantilever retaining walls. Proceedings of the 2nd International Conference on Engineering Optimization, Lisbon, 6-9 September. 10 pp. CD-ROM. ISSN: 978-898-96264-3-0.
- PEREA, C.; YEPES, V.; ALCALÁ, J.; HOSPITALER, A.; GONZÁLEZ-VIDOSA, F. (2006). Heuristic optimization of reinforced concrete road bridge frames. Proceedings of the Eighth International Conference on Computational Structures Technology. Civil-Comp Press. Paper 208, 9 pp. Las Palmas, Spain. ISSN: 1-905088-08-6.
- PEREA, C.; ALCALÁ, J.; MARTÍNEZ, F.; YEPES, V.; GONZÁLEZ-VIDOSA, F. (2006). Optimum design of the box frame tunnel of the Underground Line Palma-UIB. Proceedings of the X International Conference on Project Engineering. Valencia, Spain. September, pp. 269-278. ISSN: 84-9705-987-5.
- GONZÁLEZ-VIDOSA, F.; YEPES, V.; ALCALÁ, J.; CARRERA, M.; PEREA, C. (2005). Simulated annealing optimization of walls, portal and box reinforced concrete road structures, in Hernández, S. and Brebbia, C.A. (ed.): Proceedings of 9th International Conference on Computed Aided Optimum Designed in Engineering (OPTI-2005). WIT Press, pp. 175-186. Skiathos (Greece), may 2005. ISSN: 1-84564-016-0. ISSN: 1746-4498 (print). (pdf)
- GONZÁLEZ-VIDOSA, F.; YEPES, V.; ALCALÁ, J.; CARRERA, M.; PEREA, C. (2005). Optimización por cristalización simulada de pórticos y marcos de paso de carretera. I Jornadas de Investigación en Construcción. Instituto de CC. E. Torroja. CSIC. Vol. I, pp. 373-381. Ed. AMIET. Madrid, 2–4 June 2005. ISSN: 84-931709-5-X.
Book chapters
- MARTÍ, J.V.; ALCALÁ, J.; GARCÍA-SEGURA, T.; YEPES, V. (2017). Heuristic design of a precast-prestressed concrete U-beam and post-tensioned cast-in-place concrete slab road bridges. High Performance and Optimum Design of Structures and Materials II, Chap. 2, pp. 17-38. WIT Press, 2016. ISBN 978-1-78466-143-4.
- GONZÁLEZ-VIDOSA, F.; YEPES, V.; ALCALÁ, J.; CARRERA, M.A.; PEREA, C.; PAYÁ, I.J. Optimization of reinforced concrete road structures by simulated annealing. Simulated Annealing, Chap. 5, pp. 307–320. I-Tech Education and Publishing, 2008. ISBN 978-953-7619-07-7.
Participation in funded research projects
-
RESILIENT LIFE-CYCLE OPTIMIZATION OF HIGHLY SOCIALLY AND ENVIRONMENTALLY EFFICIENT HYBRID AND MODULAR STRUCTURES UNDER CONDITIONS
Spanish State Research Agency (Agencia Estatal de Investigación)
Ref.: PID2023-150003OB-I00
Participating researchers: Yepes Piqueras, Víctor; Alcalá González, Julián; Martí Albiñana, José Vicente; Negrín Díaz, Iván Antonio
Period: 01/09/2024–31/08/2027
Funding: 74.125,00 € -
A YEAR COMMUNICATING SCIENCE: ANNUAL PLAN OF THE UCC+I OF THE UNIVERSITAT POLITÈCNICA DE VALÈNCIA
Spanish Foundation for Science and Technology (Fundación Española para la Ciencia y la Tecnología)
Ref.: FCT-23-19387
Participating researchers: Monserrat del Río, Jose Francisco; Alcalá González, Julián; and 15 others
Period: 01/07/2024–30/06/2025
Funding: 30.000,00 € -
HYBRID LIFE-CYCLE OPTIMIZATION OF BRIDGES AND HIGHLY SOCIALLY AND ENVIRONMENTALLY EFFICIENT COMPOSITE AND MODULAR STRUCTURES UNDER RESTRICTED BUDGETS
Spanish State Research Agency (Agencia Estatal de Investigación)
Ref.: PID2020-117056RB-I00
Participating researchers: Yepes Piqueras, Víctor; Alcalá González, Julián; Ruiz Vélez, Andrés; Martí Albiñana, José Vicente; Martínez Muñoz, David; Negrín Díaz, Iván Antonio
Period: 01/09/2021–31/08/2024
Funding: 72.842,00 € -
PIONEERS INTO PRACTICE SPAIN 2022
Climate-KIC Holding B.V.
Participating researchers: Gómez Martín, Maria Esther; Molines Llodra, Jorge; Sanz Benlloch, María Amalia; Giménez Carbó, Ester; Andrés Doménech, Ignacio; Alcalá González, Julián
Period: 01/09/2022–31/12/2022
Funding: 10.000,00 € -
MARITIME THEMED ACCELERATOR
Climate-KIC Holding B.V.
Ref.: EIT_3.1.1_210206_P066_1A
Participating researchers: Gómez Martín, Maria Esther; Medina Folgado, Josep Ramón; Coll Arnau, Salvador; Pallarés Rubio, Luis; Aguilar Herrando, José; Giménez Carbó, Ester; Andrés Doménech, Ignacio; Pallarés Rubio, Francisco Javier; Alcalá González, Julián.
Period: 01/10/2021–31/12/2021
Funding: 21.206,00 € -
EFFICIENT INFRASTRUCTURE PROCUREMENT UNDER SOCIAL AND ENVIRONMENTAL SUSTAINABILITY CRITERIA (CONSOST)
Generalitat Valenciana
Ref.: GV/2018/085
Participating researchers: García-Segura, Tatiana; Montalbán-Domingo, Laura; Alcalá-González, Julián; Sanz-Benlloch, María Amalia.
Period: 01/01/2018–01/01/2019
Funding: 5.900,00 € -
DECISION-MAKING IN THE LIFE-CYCLE MANAGEMENT OF HIGHLY SOCIALLY AND ENVIRONMENTALLY EFFICIENT PRESTRESSED BRIDGES UNDER RESTRICTED BUDGETS
Ministry of Economic Affairs and Digital Transformation (Ministerio de Asuntos Económicos y Transformación Digital)
Ref.: BIA2014-56574-R-AR
Participating researchers: Penadés-Plá, Vicent; García-Segura, Tatiana; Tasquer-Val, Daniel; Alcalá-González, Julián; Yepes, V.; Martí Albiñana, José Vicente; Pellicer, Eugenio; Gonzalez Vidosa, Fernando.
Period: 01/01/2015–01/10/2018
Funding: 41.140,00 € -
EFFICIENT DESIGN OF STRUCTURES WITH NON-CONVENTIONAL CONCRETES BASED ON MULTI-OBJECTIVE SUSTAINABILITY CRITERIA USING DATA-MINING TECHNIQUES
Ministry of Economic Affairs and Digital Transformation (Ministerio de Asuntos Económicos y Transformación Digital)
Ref.: BIA2011-23602
Participating researchers: García-Segura, Tatiana; Alcalá-González, Julián; Martínez Martín, Francisco Joaquín; Luz Ivars, Alejandro José; Yepes, V.; Martí Albiñana, José Vicente; Gonzalez Vidosa, Fernando.
Period: 01/01/2012–31/05/2015
Funding: 21.780,00 € -
ECONOMIC AND ENVIRONMENTAL CRITERIA FOR THE OPTIMAL DESIGN OF CAST-IN-PLACE CONCRETE OVERPASSES USING ARTIFICIAL-INTELLIGENCE AND DATA-MINING TECHNIQUES
Generalitat Valenciana
Ref.: GV/2010/086
Participating researchers: Villaba Izquierdo, Pere; Alcalá-González, Julián; Adam, Jose M; Yepes, V.
Period: 01/01/2010–01/01/2012
Funding: 6.000,00 € -
DATA MINING APPLIED TO THE ESTABLISHMENT OF OPTIMAL DESIGN AND PRELIMINARY-DIMENSIONING CRITERIA FOR PRESTRESSED-CONCRETE SLAB BRIDGE DECKS
Universitat Politècnica de València
Ref.: PAID-06-09-2743
Participating researchers: Villaba Izquierdo, Pere; Alcalá-González, Julián; Yepes, V.; Gonzalez Vidosa, Fernando.
Period: 04/03/2009–04/01/2010
Funding: 46.180,00 € -
SUSTAINABLE OPTIMAL DESIGN OF PRESTRESSED-CONCRETE SLAB BRIDGE DECKS
Ministry of Education (Ministerio de Educación)
Ref.: BIA2006-01444
Participating researchers: F. González Vidosa, A. Hospitaler, V. Yepes and J. Alcalá.
Period: 01/10/2006–01/10/2009
Funding: 32.065,00 € -
ECONOMIC HEURISTIC OPTIMIZATION OF ROAD AND RAILWAY UNDERPASS FRAMES
Ministry of Public Works (Ministerio de Fomento)
Ref.: 80016/A04
Participating researchers: F. González Vidosa, A. Hospitaler, V. Yepes and J. Alcalá
Period: 01/11/2005–30/11/2007
Funding: 30.000 €
PhD theses supervised
Multicriteria optimization for sustainable design of post-tensioned concrete slab bridges using metamodels
Lorena Yepes Bellver
Defended: 06/06/2025
Supervisor: Julián Alcalá González
Optimal design of socially and environmentally efficient reinforced concrete precast modular road frames under constrained budgets
Andrés Ruiz Vélez
Defended: 04/12/2024
Supervisors: Víctor Yepes; Julián Alcalá González
Life cycle optimization analysis of bridge sustainable development
Zhiwu Zhou
Defended: 13/01/2023
Supervisors: Víctor Yepes; Julián Alcalá González
Heuristic optimization of post-tensioned slab floors
Ángel Manuel Rodríguez-Calderita Facundi
Defended: 09/12/2015
Supervisors: Víctor Yepes; Julián Alcalá González
Patents
STEEL–CONCRETE COMPOSITE BOX GIRDER
Authors: Julián Alcalá González; Ferran Navarro Ferrer
Reference: P202030530
National filing date: 04/06/2020
Other research and dissemination activities
Technology and research in building 2015
FERIA DE VALENCIA EXCO/CEVISAMA. FMI
Start date: 11/02/2015 · End date: 13/02/2015
Authors: David Llacer, Enrique; Yepes, V.; Rodríguez-Calderita-Facundi, Ángel Manuel; Alcalá González, Julián
Professional experience
Between 1991 and 2002, collaboration with AMINSA (Agrupación Mediterránea de Ingeniería S.A.) on the preparation of the following projects:
-
UPGRADING OF THE CREVILLENTE–TORREVIEJA CORRIDOR
COPUT, Generalitat Valenciana (Roads Division)
Alicante, 1991
Design and structural analysis of eight (8) bridges and one viaduct over the channelized Segura River. -
NEW ROJALES–GUARDAMAR DEL SEGURA ROAD
COPUT, Generalitat Valenciana (Roads Division)
Alicante, 1993
Design of soil-consolidation and ground-improvement treatments for the foundations of high embankments. Design and structural analysis of nine (9) bridges and one viaduct over the channelized Segura River. -
NEW DAM ON THE GUADIATO RIVER IN THE MUNICIPALITY OF ALMODÓVAR DEL RÍO
Directorate-General for Hydraulic Works, M.O.P.T.
Córdoba, 1993
Design and structural analysis of a slab over the crest spillways. Design and structural analysis of a crossing structure over the stilling basin. Design and structural analysis of a viaduct over the reservoir tailwater area. Stability calculations for the dam body. -
L’ALCUDIA–ALCIRA MOTORWAY. C-3322
COPUT, Generalitat Valenciana (Roads Division)
Valencia, 1994
Design and structural analysis of five overpasses and four bridges with precast decks. -
CASTELLÓ–POBLA TORNESA MOTORWAY. CASTELLÓ–BORRIOL (SOUTH) BYPASS SECTION
COPUT, Generalitat Valenciana (Roads Division)
1994
Design and structural analysis of a bridge with a precast deck. -
ALACANT–ALCOI MOTORWAY. ALACANT–RAMBLA DE RAMBUCHAR SECTION
COPUT, Generalitat Valenciana (Roads Division)
1994
Design and structural analysis of structures. -
UPGRADING OF THE C-238. ACCESSES TO CASTELLÓ AND JAUME I UNIVERSITY
COPUT, Generalitat Valenciana (Roads Division)
1995
Design and structural analysis of structures. -
SOUTHERN BYPASS OF ALMORADÍ FOR THE A-304 AND C-3321 ROADS
COPUT, Generalitat Valenciana (Roads Division)
Alicante, 1995
Design and structural analysis of structures and special foundations. -
ALACANT–ALCOI MOTORWAY. IBI–CASTALLA BYPASS SECTION
COPUT, Generalitat Valenciana (Roads Division)
1995
Project subsequently transferred to MOPTMA. Design and structural analysis of structures. -
ALACANT–ALCOI MOTORWAY. RAMBLA DE RAMBUCHAR–CASTALLA SECTION
COPUT, Generalitat Valenciana (Roads Division)
1995
Project subsequently transferred to MOPTMA. Geotechnical study of the alignment. Design and structural analysis of structures. -
REMOVAL OF AT-GRADE INTERSECTIONS ON THE NEW BORRIOL–BETXÍ ROAD AND WESTERN ACCESS TO CASTELLÓN
COPUT, Generalitat Valenciana (Roads Division)
1996
Design and structural analysis of structures. -
NÁQUERA BYPASS (PHASE 1) ON THE VP-6044
Diputació Provincial de València (Roads Department)
Valencia, 1996
Design and structural analysis of structures. -
NEW CASTELLÓ–BENICÀSSIM ROAD
COPUT, Generalitat Valenciana (Roads Division)
1996
Design and structural analysis of structures. -
REMODELLING OF THE INTERCHANGE BETWEEN THE A-7 MEDITERRANEAN MOTORWAY AND THE CV-80
COPUT, Generalitat Valenciana (Roads Division)
Alicante, 1996
Design and structural analysis of structures.
Technical assistance to the construction management of the following works:
-
UPGRADING OF THE C-3322 REGIONAL ROAD BETWEEN CHAINAGE 79.9 AND CHAINAGE 96.4. CHESTE–LLÍRIA SECTION
COPUT, Generalitat Valenciana (Roads Division)
Valencia, 1993
Verification and structural reassessment of various structures. -
NEW BORRIOL–BETXÍ ROAD AND WESTERN ACCESS TO CASTELLÓN
COPUT, Generalitat Valenciana (Roads Division)
1993
Verification and structural reassessment of various structures. -
BETXÍ BYPASS ON THE ALMENARA–LA JANA CORRIDOR. BETXÍ SECTION
COPUT, Generalitat Valenciana (Roads Division)
1994
Verification and structural reassessment of various structures. -
DUALLING OF THE ACCESS TO ALACANT VIA THE A-213. ALACANT–RAMBLA DE RAMBUCHAR SECTION
COPUT, Generalitat Valenciana (Roads Division)
1995
Verification and structural reassessment of various structures. -
UPGRADING AND ALIGNMENT IMPROVEMENT OF THE CN-225 FROM TERUEL TO GRAO DE CASTELLÓN, CHAINAGE 0.0 TO 23.4. EL JUNCAR–MONCÓFAR SECTION
Ministry of Public Works. Directorate-General for Roads
Provinces of Valencia and Castellón
Head of the Technical Assistance Unit and Health and Safety Coordinator.
From 2002 to the present, projects carried out as an independent practitioner:
-
UPGRADING OF THE ACCESSES TO PETRER
IVA-LEYING / Diputación de Valencia
Valencia
Widening of the access bridge to Petrés over the Palancia River. Co-author: Fernando González Vidosa. -
CIUDAD DE LA LUZ, ALICANTE
INCEC / Ciudad de la Luz
Pedestrian footbridge in the film-production studio area. Co-author: Fernando González Vidosa. -
ACCESSES TO THE RIODEL INDUSTRIAL ESTATE IN MUTXAMEL
ELECNOR
Alicante
Overpass with a precast deck. Co-author: Fernando González Vidosa. -
FONTANALS BYPASS
ROVER-ALCISA / Ministry of Public Works
Girona
Overpass over railway tracks. Co-author: Fernando González Vidosa. -
DUALLING OF THE CV-10 ROAD. BETXÍ–BORRIOL SECTION
UTE Borriol-Betxí / COPUT
Overpasses corresponding to structures E-4 and E-6. Co-author: Fernando González Vidosa. -
REMODELLING OF THE ACCESSES TO VILLARREAL
FERROVIAL-AGROMAN / COPUT
Bridge over a ravine and widening of a culvert. Co-author: Fernando González Vidosa. -
MOTORWAY CONNECTING THE SOUTHERN DISTRIBUTOR WITH THE A-7 MOTORWAY
UTE FCC-PAVASAL / COPUT
Continuous prestressed-deck overpasses corresponding to structures OF 1.1, OF 1.9, OF 2.9, OF 4.5, OF 4.8/4.9 and OF 4.6. Co-author: Fernando González Vidosa. -
MADRID–LEVANTE HIGH-SPEED RAILWAY. CAUDETE DE LAS FUENTES SECTION
Ingeniería Valenciana / GIF
Valencia
Design of five overpasses. Co-author: Fernando González Vidosa. -
CAMINO DE CASTILLA MOTORWAY. MONFORTE DEL CID–CREVILLENTE
FERROVIAL-AGROMAN / Ministry of Public Works
Structures E-1, E-2, E-3, E-5, E-6, E-8 and E-9. Co-author: Fernando González Vidosa. -
SOUTHERN ACCESS TO THE PORT OF CASTELLÓN
Dragados-FCC / Ministry of Public Works
Continuous post-tensioned deck structures Pesas-3 and PK 5+000. Co-author: Fernando González Vidosa. -
A-23 MUDÉJAR MOTORWAY. CALAMOCHA–ROMANOS SECTION
UTE Calamocha / Ministry of Public Works
Prestressed span-by-span viaducts E-10 and E-13. Co-author: Fernando González Vidosa. -
METRO STATION IN TORRENTE
COPUT / Ferrovial
Two station roof slabs. Co-author: Fernando González Vidosa.
Bridge in Cervera del Maestre
Bridge over the Cervera ravine, designed in 2001 to restore the CV-135 after the existing bridge collapsed because of scour around its piers.
Pergola structure on the Atocha approaches, Madrid–Levante high-speed railway (Parla, Madrid)
When one railway line has to cross another at a very acute skew angle, pergola structures are often used. This one was built while trains remained in service on the lower tracks. It is fully precast, with precast approach viaducts added to avoid long retaining walls for the embankment.
Overpass on the N-340, Almazora (Castellón)
Designed by the Carlos Fernández Casado engineering office, the edge girder was struck by the arm of an excavator, leaving the prestressing ducts exposed. After a load test confirmed that the structure retained adequate resistance, the girder was reconstructed and all defects were treated before reopening the bridge to traffic.
-
ALMASSORA–GRAO DE CASTELLÓN MOTORWAY
SEDESA / COPUT
Prestressed structure. Co-author: Fernando González Vidosa. -
LEVEL-CROSSING REMOVAL IN SIGÜENZA
ROVER / Ministry of Public Works
Guadalajara
Overpass structure. Co-author: Fernando González Vidosa. -
NEW METRO STATION ON BAILÉN STREET IN VALENCIA
COPUT / Ferrovial
Eight station roof slabs. Co-author: Fernando González Vidosa. -
ELCHE PARKWAY
FCC Construcción / COPUT
Prestressed structures at the IFA interchange. Co-authors: Fernando González Vidosa and C. Perea.
-
A-23 MUDÉJAR MOTORWAY. REGAJO–VIVER SECTION
Viver UTE / Ministry of Public Works
Regajo and Magallán viaducts. Co-authors: Fernando González Vidosa, F. Martínez and C. Perea. -
ALICANTE TRAMWAY NETWORK
FCC / COPUT
Salto del Carnero span-by-span railway bridge. Co-author: Fernando González Vidosa. -
A-7 MEDITERRANEAN MOTORWAY. COCENTAINA–PUERTO DE ALBAIDA SECTION
OFITECO / MOPU
Overpass at PK 13+570, Viaduct 1, Viaduct 2 and bridges at the Albaida River roundabout. Co-author: Fernando González Vidosa. -
N-332. ONDARA AND VERGEL BYPASS
Vías y Construcciones / COPUT
Structures E-3, E-13 and E-15. Co-author: Fernando González Vidosa.
-
URBAN DEVELOPMENT AT TORRE LA SAL
ASURINSA / MOPU
Overpass structures over the Valencia–Barcelona railway and over the motorway at Torre la Sal. Co-author: Fernando González Vidosa. -
CV-370 ROAD FROM QUART TO PEDRALBA. RIBARROJA BYPASS SECTION
CHM / COPUT
Bridge over the Porchinos ravine. -
ACCESSES TO THE GOLF MAR RESIDENTIAL DEVELOPMENT IN PUZOL
IVALEYING / COPUT
Girder overpass and prestressed overpass over the railway. Co-authors: Fernando González Vidosa and C. Perea. -
XÀTIVA NORTHERN BYPASS
Mare Nostrum / COPUT
Bridges over the railway and over the L’Angeliu ravine. Co-author: Fernando González Vidosa. -
MADRID–LEVANTE HIGH-SPEED RAILWAY. MONFORTE DEL CID–NOVELDA SECTION
ALDESA Construcciones / ADIF
Viaduct V-1, Madrid–Elche branch, and Viaduct V-2, Elche–Madrid branch. Co-authors: Fernando González Vidosa, F. Martínez and J.M. Vilaplana.
-
ALICANTE TRAMWAY
UTE INITEC-INTRAESA / COPUT
Bridge over the Goteta ravine. Co-author: Fernando González Vidosa. -
WIDENING OF THE MEDITERRANEAN MOTORWAY. VALENCIA BYPASS
ASURINSA / Ministry of Public Works
Widening of ten precast-girder decks corresponding to structures 2, 5, 6, 10, 11, 14, 16, 18, 19 and 22. Co-authors: Fernando González Vidosa and J.M. Vilaplana. -
A-70 MOTORWAY. ALICANTE BYPASS
ASURINSA / Ministry of Public Works
Dual-carriageway viaduct over a rambla. Co-author: J.M. Vilaplana.
-
A-7 MEDITERRANEAN MOTORWAY. COCENTAINA BYPASS SECTION
Vías-Corsán / Ministry of Public Works
Span-by-span viaduct E-20 and prestressed-girder viaducts E-10 and E-18. Co-authors: Fernando González Vidosa, F.J. Martínez and J.M. Vilaplana. -
URBAN DEVELOPMENT IN VILLARREAL
ASURINSA / Ministry of Public Works
Bridge over the N-340, bridge over the Seco River and bridge over the railway. Co-authors: Fernando González Vidosa, F.J. Martínez and J.M. Vilaplana. -
A-58 MOTORWAY. SANTA MARTA DE MAGASCA–CÁCERES
SANDO / Ministry of Public Works
Structures E-7 and E-8 and overpasses. Co-author: Fernando González Vidosa. -
STRUCTURES FOR THE CHANNELIZATION OF THE VACA RIVER
AMINSA / ACUAMED / Júcar River Basin Authority
Twelve precast-girder structures. Co-authors: F.J. Martínez and J.M. Vilaplana.
-
A-7 MEDITERRANEAN MOTORWAY. COCENTAINA BYPASS SECTION
Vías-Corsán / Ministry of Public Works
Span-by-span viaducts E-12 and E-15. Co-authors: F.J. Martínez and J.M. Vilaplana. -
AUTOVÍA DE LA PLANA
UTE Torreblanca / COPUT
Overpass at the interchange providing access to the new Castellón Airport and precast-girder viaduct. Co-author: J.M. Vilaplana. -
DUALLING OF THE ALMAZORA BYPASS ON THE CV-18 ROAD
Ferrovial / COPUT
Bridge over the Mijares River. Co-authors: J. Alcalá, J.M. Vilaplana and F.J. Martínez. -
NOU PONT DE FUSTA
IVALEYING / Valencia City Council
Bridge over the former Turia riverbed. Lead authors: J. Alcalá, J.M. Vilaplana and F.J. Martínez.
-
PALENCIA–A CORUÑA RAILWAY LINE
ROVER / ADIF
Overpass for the removal of a level crossing in Astorga and the Magaz viaduct over the railway. Co-author: J.M. Vilaplana. -
SOUTHERN ACCESS TO ANNABA
LIC / Ministère des Travaux Publics de Argelia
Algeria
Span-by-span box-girder viaduct and northern and southern pergola structures on the access viaducts. Co-authors: F.J. Martínez and J.V. Vilaplana.
-
EXPANSION OF THE HIGH-SPEED RAILWAY LINES BETWEEN MADRID (ATOCHA) AND TORREJÓN DE VELASCO. PINTO–TORREJÓN DE VELASCO SECTION
UTE Rover-Alcisa Iberovías / ADIF
Pergola structure and access viaducts 305.3. -
NEW BASQUE COUNTRY RAILWAY NETWORK. LEGORRETA SECTION
UTE Acciona–Vda. de Sainz / ADIF
Viaducts over the Lasarte River and Ugarán stream. Co-author: F.J. Martínez. -
CONSOLIDATION OF EMBANKMENTS ON THE FGV ALICANTE–DÉNIA LINE BETWEEN OLLA DE ALTEA AND CALPE
Vialobra / GTP
Two viaducts with foundations embedded in unstable embankments.
Viaducts 03A and 03B in Mascara (Algeria)
These viaducts were designed to avoid a side-hill alignment over unstable soils where medium- and long-term landslides were a concern. Viaduct V03B is almost 2 km long. Its piers are unusual, with the voiding arranged on the outside.
High-speed railway viaducts in Novelda (Alicante)
These viaducts combine cast-in-place decks erected on falsework with precast spans over the lower railway lines, which remained in service. Both parts are connected by bar prestressing so that the seismic force from the entire deck is transferred to one abutment. Some piers are also portal-frame piers with offset columns to allow the lower line to pass beneath.
Bridge over the Barbiguera ravine (Vinaroz, Castellón)
Foundation of the AP-7 bridge in the bed of the Barbiguera ravine. The concrete blocks visible there, created by the construction process itself, were sometimes mistaken for the bridge foundations, causing concern among residents of nearby towns.
-
SAN BERNARDO AND VALDELUNA VIADUCTS IN THE UPGRADING OF THE N-232. CASTELLÓN PROVINCIAL BOUNDARY–INTERSECTION WITH THE PROVINCIAL ROAD TO RÁFALES AT MONROYO
Rover Alcisa
Teruel
Two precast-deck viaducts on in situ reinforced-concrete piers and abutments, with shallow foundations. -
MODIFIED PLATFORM CONSTRUCTION PROJECT: NEW RAILWAY NETWORK IN THE BASQUE COUNTRY. EZKIO ITSASO–BEASAIN SECTION
UTE Ezkio (Murias, Ortiz, Vda. de Sainz)
Reinforced-concrete vaults for a cut-and-cover tunnel. -
NORTH–NORTHWEST HIGH-SPEED CORRIDOR. MADRID–GALICIA HIGH-SPEED RAILWAY LINE, OLMEDO–ZAMORA. ZAMORA STATION SECTION, PLATFORM
Rover Alcisa
Design and structural analysis of the abutments and piers of an overpass over the station track yard, with a precast deck. Design and structural analysis of the underpass beneath the tracks for the pedestrian connection between platforms. -
MULTIPURPOSE TERMINAL FOR HANDLING BULK AND PACKAGED PRODUCTS FOR QUIMGRE, S.A., AT THE PORT OF CÁDIZ
G-Tres
Reinforced-concrete cantilever retaining walls around the perimeter of the storage facility.
-
REPAIR AND STRENGTHENING PROJECT FOR THE BRIDGE OVER THE JÚCAR–TÚRIA CANAL AT PK 15+200, MUNICIPALITY OF ALDAIA (VALENCIA), FOR ITS REOPENING TO TRAFFIC
Júcar River Basin Authority
Preparation of the Construction Project.
-
CONSTRUCTION, MAINTENANCE AND OPERATION OF THE N-636 ROAD. GEREDIAGA–ELORRIO SECTION
Transitia–Acciona–Exbasa–TIIC–Viuda de Sainz
Toe-of-slope retaining structures and adjoining cut-and-cover tunnel. Vaults in the cut-and-cover tunnel. -
A-33 CIEZA–LA FONT DE LA FIGUERA MOTORWAY PROJECT. A-31/A-35 SECTION
Acciona Infraestructuras
Adaptation of five bridges and two underpasses to the current road-loading regulations. -
MODIFIED CONSTRUCTION PROJECT FOR CEIP No. 103
Conselleria d’Infraestructures, Territori i Medi Ambient / CIEGSA
Adaptation of the building foundations to the presence of contaminated soils.
-
CONSTRUCTION OF THE MOTORWAY LINK CONNECTING MASCARA TO THE EAST–WEST MOTORWAY OVER 43 KM OF 2X3 LANES. SECTION 2: RN17 INTERCHANGE (HACINE)–RN17A INTERCHANGE (TIZI), 18 KM
UTE Mascara (LIC–CHM)
Design of two reinforced-concrete box underpasses and two box-section viaducts: Viaduct 03A, 490.0 m long, and Viaduct 03B, with a total length of 1996.0 m, constructed using movable scaffolding systems for spans of 40–50 m.
-
MODIFIED CONSTRUCTION PROJECT No. 1 FOR THE SOUTHERN BYPASS OF BADAJOZ. SECTION III. EX-107–FAIRGROUNDS. LOT I EX-107–PK 9+700
Rover Alcisa S.A.
Design of the in situ foundations, piers and abutments of the new bridge over the Guadiana River and the new crossing over the BA-21 road.
Professional services and knowledge transfer through the Universitat Politècnica de València:
-
MODIFIED PROJECT FOR THE IMPLEMENTATION OF STANDARD GAUGE ON THE MEDITERRANEAN CORRIDOR. FONT DE SANT LLUÍS–ALMUSSAFES SUBSECTION
Hormigones Martínez S.A. – Mantenimiento de Estaciones S.A.
Design of the lateral-retaining system for the existing track, contiguous pile walls and an underpass beneath the existing railway line. -
CONSTRUCTION PROJECT FOR THE VALENCIA–SANT ISIDRE AND VALENCIA–LA FONT DE SANT LLUÍS CONNECTIONS. TRACK AND ELECTRIFICATION
VILOR S.L.
Design and structural analysis of a railway underpass, retaining walls, a pedestrian underpass connecting the station platforms, and a steel canopy protecting the ticket-barrier area. -
CONSTRUCTION PROJECT FOR THE ACCESSES TO A NEW TERTIARY-DEVELOPMENT AREA IN XIRIVELLA (VALENCIA)
David Llorca Ingeniero
Four reinforced-concrete structures, precast girders, box structures and precast walls for access to the underground parking level of a shopping centre and for an elevated exit over the interchange ramps between the V-30 and A-3. -
PEDESTRIAN CROSSING AT PK 1+130 OF FGV LINE 3. FGV–LA POBLA DE FARNALS STATION
Vialobra
Structures for stairs, ramps and lifts providing access to the underpass beneath the railway tracks. -
EXTENSION OF THE FGV MACHADO WORKSHOPS IN VALENCIA
AMINSA
Extension of a steel industrial building, with foundations overlapping the existing ones, and local strengthening beneath the jacking points used to lift railway vehicles. -
FOUNDATIONS FOR MARPOL WASTE-STORAGE TANKS AT THE PORT OF ALICANTE
INVERCREA
Design and structural analysis of a slab on ground improved with lime columns for the foundations of eight silos.
-
REPAIR OF THE ALMAZORA BRIDGE ON THE N-340
Ministry of Public Works
Repair of the bridge deck over the N-340 following a vehicle impact. -
PRICE SALMAN ST WITH KING FAHD RD BRIDGE, DAMMAM, SAUDI ARABIA
OFITECO
Principal inspection of a steel bridge with more than 34 spans comprising plate girders with a composite concrete slab. -
PARADOR NACIONAL DE LA GRANJA DE SEGOVIA
Tecnomediterránea S.L.
Design and structural analysis of a micropile-supported slab to control settlements at the outdoor swimming pool of the Parador. -
REFURBISHMENT AND IMPROVEMENT OF THE SA COMA WWTP
PANTECNIA S.L.
Design and structural analysis of the structures: pretreatment building and blower room, biological distribution chamber, biological reactor No. 3, tertiary-treatment feed chamber, outlet/overflow chamber to the infiltration well, sludge pumping station No. 1 and drainage pumping station.
-
CONSTRUCTION PROJECT FOR FOIETES PARK (BENIDORM)
UTE Barranco-Foyetes (OHL–Los Serranos)
Design and structural analysis of two retaining walls with an upper platform. -
MULTI-STOREY VEHICLE STORAGE BUILDING IN THE EXTENSION OF THE EAST DOCK AT THE PORT OF VALENCIA
INVERCREA S.L.
Design and structural analysis of the building foundations. -
VALENCIA METROPOLITAN GREEN RING
OFITECO
Design of crossings over irrigation channels, an underpass beneath a motorway, remodelling of the ramps of an existing footbridge, design of a new 420 m-long footbridge, and a footbridge over the existing FGV railway lines. -
KING FAHD ROAD, DAMMAM – SAUDI ARABIA
OFITECO
Report on the condition of the carbon-fibre strengthening of the downstand beams in the underpass. -
NEW COKE STORAGE FACILITY AT THE BP PLANT IN CASTELLÓN
BECSA
Pathology study concerning cracking in the storage-facility walls. -
WIDENING OF THE MURCIA BYPASS. REGUERÓN MOTORWAY
Infraestructuras Marítimas y Terrestres
Review of the design projects for the precast underpasses. -
CONSTRUCTION PROJECT FOR THE PEDESTAL AND RAMPS OF THE DSS-53 AND DSS-56 ANTENNAS AT THE MADRID DEEP SPACE COMMUNICATIONS COMPLEX (MDSCC)
Rover Alcisa
Study of starter bars and construction joints in the antenna support pedestal at the station.
-
INVENTORY AND INSPECTION OF STEEL AND CONCRETE CIVIL-ENGINEERING STRUCTURES AT THE CEMENT PLANTS IN PUERTO DE SAGUNTO AND VILLALUENGA DE LA SAGRA
Lafarge-Holcim
-
REPAIR OF THE A-7 BRIDGE AT THE NORTHERN SAGUNTO INTERCHANGE
Abertis
Design of the bridge-repair operations following the loss of bearings at one of the piers. -
STUDY OF THE PLACEMENT OF A VEHICLE ON THE FLOOR SLAB OF THE VELES E VENTS BUILDING
PRODEIN S.L.
Study of the behaviour of the floor slabs of the Veles e Vents building at Marina Real Juan Carlos I in Valencia during the placement of a car at the end of the cantilever.
-
AP-7 MOTORWAY
Abertis
Stability and serviceability inspections of the foundations of the Barbiguera (Vinaroz), Río Seco (Benicarló), Río Gorgos (Gata de Gorgos) and Río Algar (Altea) viaducts. -
HOTEL RH VINAROZ PLAYA
Resthotel S.A.
Report on corrosion of the beams in the strengthening framework on the roof of the building. -
PRELIMINARY DESIGN OF A WINTER-ROAD-MAINTENANCE BASE IN VILLAFRANCA DEL CID (CASTELLÓN)
CHM Obras e Infraestructuras S.A. – OCIDE Construcción S.A. UTE Conservación Castellón
Design of a 45 m 2 steel building. -
ROUNDABOUT AT THE INTERSECTION OF SANTIAGO APÓSTOL STREET AND GM-3
Mapa Ingeniería S.L.
Design of gravity retaining walls. -
WIDENING OF THE ACCESSES TO THE FORMER HOSPITAL IN SAN SEBASTIÁN DE LA GOMERA
Baluarte – Mapa Ingeniería S.L.
Design of gravity retaining walls supporting the roadway beside a ravine. -
RESTORATION OF THE FERRANDET BRIDGE ON THE CALPE–TEULADA SECTION OF THE FGV ALICANTE–DÉNIA LINE
UTE FGV Línea 9 Calpe–Teulada
Design and structural analysis of the underpinning of the abutments. -
NEW BUILDING FOR THE FACULTY OF NURSING AND PODIATRY OF THE UNIVERSITY OF VALENCIA
Rover-Alcisa
Design and structural analysis of the basement perimeter retaining system and the slab providing access for emergency vehicles. -
PEDESTRIAN AND CYCLE BRIDGE OVER THE BARRANCO DE TEULADA, PARALLEL TO THE CV-50. MUNICIPALITY OF VILAMARXANT (VALENCIA)
Preparation of the Construction Project and construction supervision.
Bridge over the V-31 in Silla (Valencia)
Because the motorway level was raised, restoring the required clearance involved lifting the deck of this bridge by about 80 cm from its original level. Load tests were carried out before and after the operation, and strengthening reinforcement was designed for the extensions to the piers and abutments.
Vehicle storage building at the Port of Valencia
A four-storey building with more than 200,000 m² of total floor area for vehicle storage, built on very poor-quality port fill. The foundation was designed using precast piles driven to a depth of 36 m.
Footbridge over the Teulada ravine (Vilamarxant, Valencia)
Steel variable-depth truss footbridge carrying the cycle route to the town’s industrial estate.
-
INSTALLATION OF EFFLUENT-DISINFECTION SYSTEMS AT THE WWTPS OF TITAGUAS, RAFELGUARAF, TORRES TORRES, VALLADA, CASTIELFABIB, FAVARA, TUÉJAR AND VENTA DEL MORO
Aquaducta S.L.
Design of a reinforced-concrete containment basin for the hypochlorite storage tank. -
MOTORWAY LINK CONNECTING THE PORT OF ORAN TO THE EAST–WEST MOTORWAY OVER 26 KM. FIRST 8 KM SECTION
CPS Ingenieros S.L.
Design review and technical assistance to the construction supervision team during the construction of a viaduct in Oran. -
UPGRADING OF THE CV-35 URBAN CROSSING THROUGH CHELVA (VALENCIA). PHASE V
Xuquer Arquitectura e Ingeniería S.L.P.
Design and structural analysis of a 56.20 m-span steel footbridge over the Barranco del Montú. -
PROPOSED TESTING OF LAP WELDS IN STEEL REINFORCING BARS FOR CONCRETE
Sendin Spain Export S.L.
Finite-element study of weld behaviour to validate the accreditation tests for operators. -
WIDENING OF THE CULVERT ON THE CV-14
CHM Obras e Infraestructuras S.A. – OCIDE Construcción S.A. UTE Conservación Castellón
Studies for widening a masonry drainage structure and review of the calculations for precast frames and wing walls. -
EMERGENCY WORKS FOR FLOOD MITIGATION ON THE V-31 MOTORWAY. CHAINAGE 2+300 TO 3+000
CHM Obras e Infraestructuras S.A.
Load-test project for the existing structure; design of the enlargement of piers and abutments; verification of the foundation block for the temporary shoring towers. -
UTIEL INDOOR SWIMMING POOL (VALENCIA)
CHM Obras e Infraestructuras S.A.
Expert report on the failure of the swimming-pool basin. -
AMMONIUM-NITRATE BAGGING BUILDING AT THE PORT OF SAGUNTO (VALENCIA)
Fertiberia S.A.
Study of structural pathologies in the building. -
RESTORATION OF LATERAL RETAINMENT ON THE CV-88 ROAD
CHM Obras e Infraestructuras S.A. – OCIDE Construcción S.A. UTE Conservación Castellón
Dry-stone wall and riprap works to restore the retaining system of the road platform affected by works carried out by a private party.
-
EMERGENCY WORKS (LOT 3) TO REPAIR DAMAGE CAUSED BY THE TORRENTIAL RAINS OF 12, 13, 14 AND 15 SEPTEMBER 2019 ON THE STATE ROAD NETWORK. PROVINCE OF ALICANTE
Levantina de Ingeniería y Construcción S.L.
Design and structural analysis of a new drainage structure to increase the capacity of the existing crossing of the N-340 over the Abanilla and Salada ramblas. -
NEW DEPARTURES-AREA ROAD LAYOUT AT ALICANTE AIRPORT
Tecnofirmes S.A.
Design and structural analysis of the widening of an underpass and the retaining walls on the widened access ramp to the airport departures terminal.
-
REMODELLING PROJECT FOR THE RAILWAY OVERPASS AT THE INTERSECTION WITH GRECO STREET IN PALMA
UTE CIOPU–PANTECNIA II
Structural analysis for the remodelling of the existing underpass beneath the FIB (Ferrocarrils de les Illes Balears) railway tracks to increase the clearance on Greco Street in Palma de Mallorca.
-
WIDENING OF THE CV-15 FOR A CYCLE LANE IN LA POBLA TORNESA
CHM Obras e Infraestructuras S.A. – OCIDE Construcción S.A. UTE Conservación Castellón
Footbridge formed by hollow-core slabs on a steel pier and reinforced-concrete abutments with micropile foundations. -
REPAIR OF JETTIES AT THE ALICANTE MARINA
Project for the removal and replacement of deteriorated hollow-core slabs in the jetty decks at the marina.
-
COASTAL-ROUTE FOOTBRIDGE OVER THE AIGUADOLIVA RAVINE BETWEEN THE MUNICIPALITIES OF VINARÒS AND BENICARLÓ (CASTELLÓN)
Assistance in the design and structural analysis of a 54 m-span steel footbridge.
-
REMODELLING OF THE FISHERMEN’S FACILITIES AT THE PORT OF PEÑÍSCOLA
Design and structural analysis of fishermen’s huts and structural assessment of existing buildings for the installation of photovoltaic panels.
-
WIDENING OF THE BRIDGE OVER THE ALGÁS RIVER IN LLÉDO (TERUEL)
Turiving S.A.
Design of a slab over the existing bridge to widen the roadway platform. -
UNDERPASS BENEATH THE TRAM TRACKS ON AVENIDA BENIARDÁ IN BENIDORM (ALICANTE)
Levantina de Ingeniería y Construcción S.L.
Design and structural analysis of a prestressed-girder deck to be precast on site for railway and road traffic. -
WIDENING OF THE CULVERT AT PK 32+960 ON THE CV-345. MUNICIPALITY OF LA YESA (VALENCIA)
Serveo Servicios S.A. y OCIDE Construcción S.A. UTE
Design of a system of precast elements for widening the road platform. -
WIDENING OF THE BRIDGE AT PK 11+500 OF THE CV-12 BETWEEN ARES DEL MAESTRE AND MORELLA (CASTELLÓN)
OCIDE Obras y Servicios S.L.
Design and structural analysis of extensions to the existing abutments for the widening of a precast-girder deck.
-
NEW FOOTBRIDGE OVER THE BARRANCO DE L’OMET IN PICASSENT (VALENCIA)
Levantina de Ingeniería y Construcción S.L. – Pantecnia S.L.
Structural analysis of foundations, piers and abutments. -
NEW “ERESMA SOLAR” PHOTOVOLTAIC PLANT IN VALVERDE DEL MAJANO (SEGOVIA)
Elecnor S.A.
Design and structural analysis of the foundations of the power units. -
CONSTRUCTION PROJECT FOR THE URBAN-DEVELOPMENT WORKS OF THE SAGUNTO LOGISTICS AREA (VALENCIA). OVERPASS 2 – AXIS 17 AND OVERPASS 3 – AXIS 16
UTE Rover Infraestructuras S.A. – Rover Rail S.A. – Serranía Geomineral S.L.
Structural analysis of piers, abutments and foundations. -
REINFORCEMENT DESIGN FOR THE START AND END CHAMBERS OF THE INTERCEPTOR SEWER ON L’AVINGUDA ESPIOCA IN SILLA (VALENCIA)
Rover Infraestructuras S.A.
Reinforcement design for the chambers. -
REPORT ON POSSIBLE CORROSION OF THE A-38 BRIDGE OVER THE JÚCAR RIVER IN SUECA (VALENCIA)
Innovia Coptalia S.A.U. y Grupo Bertolín S.A.U. – UTE Xeresa
Assessment of the condition of the bridge’s steel arches. -
PREPARATION OF A PRELIMINARY REPORT ON THE STRUCTURAL CONDITION OF THE GIORGETA AVENUE UNDERPASS IN VALENCIA AND DEFINITION OF THE GEOTECHNICAL AND STRUCTURAL INVESTIGATION CAMPAIGN
UTE Gecival S.L. y Cercle Paisaje y Arquitectura Coop.V.
Culvert widening in La Yesa (Valencia)
A partially precast slab supported on micropiles that widens the bridge platform while removing additional load from the existing structure.
Repair of the CV-36 bridge over Barranco del Poyo (Aldaia, Valencia)
Restoration of the bridge alignment by sliding and jacking using hydraulic actuators after the October 2024 DANA event in the province of Valencia.
Steel cycle and pedestrian footbridge in Chelva (Valencia)
Variable-depth steel truss carrying a cycle route over a ravine at the exit from the Valencian town of Chelva.
-
CONSTRUCTION PROJECT FOR THE VILAMARXANT WESTERN BYPASS
Intercontrol S.A.
Design of a bridge, an underpass and several retaining walls. -
DESIGN PROJECT FOR THE ABUTMENTS OF THE BRIDGE AT PK 1+028.20 OF SEPARATE PROJECT No. 4 OF THE TURIA PARKWAY. MANISES–RIBA-ROJA SECTION. SUBSECTION 4
UTE Becsa–CHM
Design of bank-seat abutments on slopes reinforced with grouted soil nails. -
CONSTRUCTION PROJECT: SAGUNTO INTERMODAL PLATFORM. OVERPASS 01 RFIG
UTE Rover–Becsa
Structural analysis of the piers, abutments and foundations of a railway bridge. -
REHABILITATION OF THE CV-36 ROAD FROM PK 8+000 TO PK 10+000 AND REPAIR OF THE VIADUCT OVER THE BARRANCO DEL POYO AT PK 8+640. MUNICIPALITIES OF ALAQUÀS, ALDAIA AND TORRENT (VALENCIA)
CHM Infraestructuras S.A.
Structural analysis of the piers and abutments of the new bridge. Foundations for the jacks used to lift the existing bridge, structural verification and design of the new abutment and its bearings. Static and dynamic load tests on both bridges. -
CV-425 ROAD FROM BUÑOL TO ALFARACHE. BRIDGE OVER THE BUÑOL RIVER AT PK 4+085. MUNICIPALITY OF BUÑOL (VALENCIA)
Rover Infraestructuras S.A.
Structural design for widening the deck and load testing. -
EM N-322 AND N-330 DANA. LOT 3
Technical assistance for the review of structural calculations.
-
SU2236. RECONSTRUCTION OF THE COLLAPSED VALENCIA BYPASS STRUCTURE OVER THE BARRANCO DEL GALLEGO DEL POYO FOLLOWING THE CATASTROPHIC EVENTS CAUSED BY THE INTENSE RAINFALL OF 29 OCTOBER 2024 IN THE PROVINCE OF VALENCIA
Review of the project design and structural calculations.
-
CONSTRUCTION PROJECT FOR THE L’OLLERIA–GANDIA CV-60 MOTORWAY. L’OLLERIA–TERRATEIG SECTION
Design and structural analysis of two viaducts over ravines (Micena and Palomar), dualling of the crossing at the CV-611 interchange, widening of two road crossings, and retaining walls for the slopes of the new motorway.
-
RAILWAY OVERPASS OVER THE CV-740 IN TEULADA (ALICANTE)
Design of new bearings for the replacement of the bridge affected by a creeping problem.
-
NEW BRIDGE OVER THE MAGRO RIVER IN HORTUNAS. MUNICIPALITY OF UTIEL (VALENCIA)
Design and structural analysis of a new bridge with a precast deck to increase the hydraulic capacity of the river through the village of Hortunas.
Other merits
Colegio de Ingenieros de Caminos, Canales y Puertos
: Professional registration no. 11,691
Member of the
Asociación de Ingenieros de Caminos, Canales y Puertos y de la Ingeniería Civil
Individual member of
ACHE – Asociación Española de Ingeniería Estructural
Other courses and seminars taught
- Design of steel elements. Academic year 2015–2016. Teaching hours: 10.5
- Civil-engineering construction techniques for building professionals. Retaining structures and ground improvement. Academic year 2010–2011. Teaching hours: 6
- Civil-engineering construction techniques for building professionals. Crossing structures in linear infrastructure projects. Academic year 2010–2011. Teaching hours: 27
- Civil-engineering construction techniques for building professionals. Earthmoving and compaction equipment. Academic year 2010–2011. Teaching hours: 9
Courses organised by the ICE Institute of Education Sciences · UPV
- Prevention of SARS-CoV-2 coronavirus transmission in the workplace. Teaching and research staff. 23/06/2020 - 30/05/2020 (2 hours)
- Options for generating question banks in PoliformaT. 11/06/2020 (2 hours)
- Copyright. Permitted uses of copyrighted material. Searching for and selecting materials with open-use licences. 06/06/2019 (4 hours)
- Integration and assessment of competences in bachelor’s and master’s theses. 30/01/2018 (4 hours)
- How to detect plagiarism through PoliformaT: the TURNITIN tool. 29/01/2018 (2.5 hours)
- Project-based learning. 12/02/2015 - 13/02/2015 (25 hours)
- Integration and assessment of competences in bachelor’s and master’s theses. 08/04/2014 - 23/04/2014 (5 hours)
- Development of multimedia resources for teaching: teaching publications using the UPV LaTeX template (University pedagogical and technological training programme). 15/01/2014 - 06/02/2014 (25 hours)
- Creating screencast videos with CamStudio. 28/05/2013 (4 hours)
- Creating subtitles for teaching videos. 21/05/2013 (4 hours)
- Developing rubrics for competence assessment. 14/05/2013 (8 hours)
- Tutoring and monitoring student work through PoliformaT. 28/06/2011 (6 hours)
- Polimedia Plus: a multimedia resource for teaching. 08/05/2012 - 28/05/2012 (20 hours)
- Learning ecosystems: challenges for engineering/science education in the 21st century. 24/01/2012 (6 hours)
- Genetic algorithms. 08/03/2004 - 12/03/2004 (10 hours)
- Reinforced and prestressed concrete (based on the EHE). 08/11/1999 - 30/11/1999 (40 hours)
Programme PRAKTIKUM Summer workshop programme for upper-secondary school students organised by the UPV
- 2026. School of Civil Engineering. School Coordinator and Project Coordinator.
- 2025. School of Civil Engineering. School Coordinator and Project Coordinator.
- 2024. School of Civil Engineering. School Coordinator and Project Coordinator.
- 2023. School of Civil Engineering. School Coordinator and Project Coordinator.
- 2022. School of Civil Engineering. School Coordinator and Project Coordinator.
- 2021. School of Civil Engineering. School Coordinator and Project Coordinator.
- 2020. School of Civil Engineering. School Coordinator and Project Coordinator.
- 2019. School of Civil Engineering. School Coordinator and Project Coordinator.
- 2018. School of Civil Engineering. School Coordinator and Project Coordinator.
- 2017. School of Civil Engineering. Project Coordinator and participating lecturer.
- 2016. School of Civil Engineering. School Coordinator and participating lecturer.
- 2015. School of Civil Engineering. Participating lecturer.